[
I
Read Before Servicing ]
- 11 -
HWE09070
GB
7. Notes
To evacuate air from the entire system
Applying a vacuum through the check joints at the refrigerant service valve on the high and low pressure sides (BV1
and 2) is not enough to attain the desired vacuum pressure.
Be sure to apply a vacuum through the check joints at the refrigerant service valve on the high and low pressure
sides (BV1 and 2) and also through the check joints on the high and low pressure sides (CJ1 and 2).
To evacuate air only from the outdoor units
Apply a vacuum through the check joints on the high and low pressure sides (CJ1, and 2).
To evacuate air from the indoor units and extension pipes
Apply a vacuum through the check joints at the refrigerant service valve on the high and low pressure sides (BV1
and 2).
Содержание CMB-PW202V-J
Страница 1: ...Service Handbook AIR CONDITIONERS MODEL CMB PW202V J ...
Страница 9: ...HWE09070 GB ...
Страница 11: ... 2 ...
Страница 25: ... 16 ...
Страница 28: ... II Restrictions 19 HWE09070 GB ...
Страница 31: ... 22 II Restrictions GB HWE09070 ...
Страница 36: ... 27 HWE09070 GB III WCB Components 1 WCB Components 29 2 Control Box of the WCB 30 3 WCB Circuit Board 31 ...
Страница 37: ... 28 ...
Страница 40: ... III WCB Components 31 HWE09070 GB 3 WCB Circuit Board SW1 SW2 SW5 SW6 SW4 ...
Страница 41: ... 32 III WCB Components GB HWE09070 ...
Страница 42: ... 33 HWE09070 GB IV Electrical Wiring Diagram 1 Electrical Wiring Diagram of the WCB 35 ...
Страница 43: ... 34 ...
Страница 45: ... 36 IV Electrical Wiring Diagram GB HWE09070 ...
Страница 46: ... 37 HWE09070 GB V Refrigerant Circuit 1 Refrigerant Circuit Diagram 39 2 Principal Parts and Functions 40 ...
Страница 47: ... 38 ...
Страница 51: ... 42 ...
Страница 61: ... 52 VI Control GB HWE09070 ...
Страница 63: ... 54 ...
Страница 73: ... 64 ...
Страница 108: ... 99 HWE09070 GB IX LED Monitor Display on the Outdoor Unit Board 1 How to Read the LED on the Service Monitor 101 ...
Страница 109: ... 100 ...