–100–
(3)
Thermistor (Liquid and gas piping temperature detection)
Be careful when removing heavy parts.
Procedure
Photos
1. Remove the front panel
1
Use the procedure under (1)-1.2.3 to check
TH11, TH12, TH15, and TH16.
2. Disconnect the piping sensor lead from the control-
ler panel.
1
TH11 - TH12 (CN10)
2
TH15, TH16 (CN11)
3. Pull the temperature sensor from the temperature
sensor housing and replace it with a new sensor.
4. Connect the temperature sensor lead securely to
the controller board.
(4) Pressure Sensor
Procedure
Photos
1. Remove the front panel.
1
Use the procedure under (1)-1.2 to check PS1
and PS3.
2. Disconnect the connector of the applicable pressure
sensor from the controller board and insulate the
connector.
1
Liquid pressure sensor (CNP1)
2
Intermediate pressure sensor (CNP3)
3. Install a new pressure sensor at the location shown
in the photograph, and plug the connector into the
controller board.
Important
1
In the case of gas leakage from the pressure sen-
sor, take actions to fix the leak before performing
the above procedure.
PS1
PS3
TH16
TH11
TH15
TH12
Содержание CITY MULTI P500YMF-C
Страница 2: ......
Страница 15: ... 13 CNFAN CNPOW CNFC2 CN15V1 CNDR1 CNIPM1 CNE CNDC1 FANCON board G A board ...
Страница 16: ... 14 Y C board SNB board ...
Страница 17: ... 15 BC controller CNTR CN02 M NET transmission CN03 CN12 Power supply 1 EARTH 3 N 5 L SW4 SW2 SW1 SW5 ...
Страница 18: ... 16 RELAY 10 board RELAY 4 board ...
Страница 22: ... 20 3 Electrical Wiring Diagram PURY P400 500YMF C ...
Страница 73: ... 71 Check Valves Block2 1 3 5 7 6 4 2 CV5b CV4b CV6b CV2b ST1 BV1 BV2 CV3b Check Valves Block2 1 3 7 2 4 5 6 ...
Страница 91: ... 89 Motor Compressor G A board Red U V W N P White Black Black Capacitor C2 C3 Red IPM ...