14
Slide the Carrier Frame downwards until it bottoms out and locks with the Rail Frame.
The user will be able to feel the locking action as the Carrier Frame mates with the locking features on
the Rail Frame.
The Carrier Frame/CPU Package assembly is now completely loaded onto the Rail Frame.
The PnP Cover Cap can now be removed. Grip the two lift tabs marked “REMOVE” at the middle of the
long sides of the PnP Cover Cap and pull vertically upwards to remove the PnP Cover Cap from the
Socket Housing.
Be very careful not to drop the PnP Cover Cap into the exposed contact field during the removal
process.
Содержание E8020
Страница 1: ...E8020 OCP Computing Sled User Manual Version 1 0 ...
Страница 7: ...2 APPENDIX A 124 ...
Страница 12: ...7 2 1 2 Ultra Note 4x U 2 drives One FHHL PCIe card ...
Страница 29: ...24 2 2 5 Release the Drive A Pull the locking Drive lever open in the direction of arrow B Take out Drive ...
Страница 32: ...27 B Push the Right Left handle bar to lock the Drive Cage ...
Страница 33: ...28 C Insert the Riser Card ...
Страница 34: ...29 D Fasten the latch to lock the riser card E Open the retainer as shown ...
Страница 36: ...31 3 Mainboard Information 3 1 Board Introduction Here are different views of the main board ...
Страница 39: ...34 3 4 Block Diagram ...
Страница 47: ...42 CPU 0 Information ...
Страница 50: ...45 4 3 4 Serial Port Console Redirection ...
Страница 54: ...49 Console Redirection Settings COM1 ...
Страница 62: ...57 4 3 7 USB Configuration ...
Страница 73: ...68 Socket 0 Information View Information related to Socket 0 ...
Страница 94: ...89 4 9 Save Exit ...
Страница 127: ...122 Here is the example of OOB BIOS update IP Your BMC IP C439_TGPSNTT_101 BIN The BMC image you received ...
Страница 128: ...123 6 2 2 BMC update You can do BMC update via local or OOB Example of local BMC update Example of BMC update via OOB ...