Mira vigour Скачать руководство пользователя страница 20

19

Caution!

  When  resistance  is  felt 

DO 

NOT USE FORCE

 to turn the spindle any 

further  as  this  is  the 

maximum  shower 

temperature

 

obtainable 

with the available 

hot  water  storage  temperature. 

FORCE

 

will 

DAMAGE

 the internal components.

6.

  Turn the temperature spindle until the 

maximum water temperature required 
is obtained.

 

Warmer

 - Turn spindle anticlockwise 

 

Cooler

 - Turn spindle clockwise

7.

  Insert the temperature hub with the pip 

on the temperature hub aligned with 
the slot on the thermostatic cartridge. 
Secure the temperature hub with the 
retaining screw.

8.

  Insert the outer low control knob in 

the maximum low position.

9.

  Insert the temperature indicator trim 

and  the  inner  temperature  control 

knob.

 

Caution!

  If  resistance  is  felt  when 

turning the inner temperature control 

knob, 

DO  NOT  USE  FORCE

  to 

turn the knob any further as this will 

DAMAGE

 internal components.

10.

  Make  sure  the  inner  temperature 

control  knob  can  be  fully  turned  in 

both directions.

11.

  Check  the  maximum  temperature 

setting.  If  necessary  repeat  the 
temperature  adjustment  until  the 
required temperature is achieved. 

Inner Temperature Control Knob

Maximum Flow Position

Temperature Indicator Trim

Temperature Spindle

Align the pip on the  

temperature hub with the slot in the 

thermostatic cartridge.

Содержание vigour

Страница 1: ...1 POWER SHOWER These instructions are to be left with the user T h e r m o s t a t i c THERMOSTATIC Installation and User Guide...

Страница 2: ...st with low interest rates PRICE MATCH always get the best deals available Boilers Radiators Heating controls Pipes ittings Cylinders Fires Renewable energy Bathroom suites Kitchen sinks taps Showers...

Страница 3: ...on Requirements 8 Installation 9 General 9 Electrical 9 Plumbing 10 Commissioning 17 Maximum Temperature Setting 18 Disabling the Temperature Override Button 20 Operation 21 Fault Diagnosis 22 Fault D...

Страница 4: ...MAKE SURE SUPPLEMENTARY BONDING COMPLIES WITH THE REQUIREMENTS FOR ELECTRICAL INSTALLATIONS In accordance with the current edition of The Plugs and Sockets etc Safety Regulations in force at the time...

Страница 5: ...ces speciied by the local electricity supply company in force at the time of installation The installation should be carried out by an electrician or contractor who is registered with or is a member o...

Страница 6: ...trol Knob 1 x Temperature Indicator Trim 3 x Rubber Feet 1 x Push Fit Release Tool 3 x Rubber Wall Plugs 3 x Fixing Screws Tick the appropriate boxes to familiarise yourself with the part names and to...

Страница 7: ...6 DIMENSIONS All dimensions are nominal and in millimetres 310 66 28 210 28 20 20 130 80 88...

Страница 8: ...in 1 C of selected temperature with a 10 C change in the hot or cold water supply If the cold supply fails the thermostatic mixer will shut down low of water to seepage levels in approximately 2 secon...

Страница 9: ...8 Gravity Fed system The shower MUST be fed from a cold water cistern and hot water cylinder providing nominally equal pressure INSTALLATION REQUIREMENTS 10 m Maximum 80 mm Minimum 30 60...

Страница 10: ...hower unit is designed for surface mounting only and must not be recessed into any wall or cavity or tiled up to as this prevents air circulating to the rear of the unit Electrical 1 The shower unit m...

Страница 11: ...nsfer may damage plastic components 5 Do not use jointing compounds on the shower unit joints they may cause damage to the mechanism inside 6 Do not insert ingers into the push it connections 7 The su...

Страница 12: ...ition on the slide bar the handset does not fall below the minimum clearance gap between the bath or shower tray spillover level of 25 mm 2 Hot and cold inlet supply connections are Hot Left Cold Righ...

Страница 13: ...trunking not supplied Allow suficient cable to connect to the terminal block approximately 275 mm Strip back approximately 30 mm of outer cable insulation 5 Loosen the three cover securing screws and...

Страница 14: ...structures 9 Use the push it release tool to push the grey collars into the manifold to release the shower unit from the supply pipes Warning Make sure there are no buried cables or pipes near the ix...

Страница 15: ...e of the unit 13 Fit the blanking plates to the unit case in the following manner For Top Inlet Pipework For Rear Inlet Pipework For Bottom Inlet Pipework Rubber Feet Fit the full blanking plates to t...

Страница 16: ...pplied or alternative ixings depending on the wall structure Do not over tighten Make sure that the electrical supply cable is correctly seated in the channel in the back of the case 17 Connect the li...

Страница 17: ...21 Insert the temperature indicator trim and the inner temperature control knob 22 The power thermostatic shower will now require commissioning refer to COMMISSIONING 23 Install the shower ittings ref...

Страница 18: ...eaks 3 Switch on the electrical supply 4 Turn the outer flow control anticlockwise to full low 5 Rotate the inner temperature control anticlockwise to check the hot supply and clockwise to check the c...

Страница 19: ...ture stop Do not depress the override button 3 Check the shower temperature 4 If the maximum temperature requires adjustment then remove the outer low control and the inner temperature control knobs S...

Страница 20: ...h the retaining screw 8 Insert the outer low control knob in the maximum low position 9 Insert the temperature indicator trim and the inner temperature control knob Caution If resistance is felt when...

Страница 21: ...h it release tool under the outer low control knob and lever the control knob assembly off the shower unit 3 Unclip the concealed end of the override button from the temperature indicator trim and car...

Страница 22: ...for warmer water and clockwise for cooler water the numbers indicate the relative temperature 1 cold 4 tepid 7 Hot Warning Operation of the override button will allow a shower temperature above the p...

Страница 23: ...ater temperatures do not exceed 65 C Reset maximum temperature refer to COMMISSIONING Blend temperature unstable Spray plate blocked Inlet ilters blocked Isolating valve partially closed Plumbing syst...

Страница 24: ...is too high up the pipe Refer to the plumbing system diagram in the INSTALLATION REQUIREMENTS for the correct connection method Note the 1 metre hot takeoff dimension Consider increasing the cold fee...

Страница 25: ...ssembly The pump does not operate Electrical supply failure PCB failure Potentiometer failure Motor overheated thermal switch operated Check the power supply Renew the PCB Renew the harness assembly I...

Страница 26: ...ore replacing any parts make sure that the underlying cause of the malfunction has been resolved Cleaning Many household cleaners contain abrasives and chemical substances and should not be used for c...

Страница 27: ...mponents identiied C 453 13 Solenoid Valve Assembly components identiied D 453 14 Filter Cap Assembly 453 15 Seal Pack components identiied E 453 22 Stud Wall Fixing Kit Push it Release Tool 3 x Fixin...

Страница 28: ...27 147 67 453 01 453 14 A B H A D E D E B D 1532 332 453 28 A F A E G E B E F E C C G H G H G 453 08 1532 365...

Страница 29: ...ogramme calls may be recorded or monitored Our Customer Services Team is comprehensively trained to provide every assistance you may need help and advice spare parts or a service visit Spare Parts We...

Отзывы: