![Mira Advance ATL J97A Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/mira/advance-atl-j97a/advance-atl-j97a_installation-manual_1805012023.webp)
23
COMMISSIONING
On initial installation, the appliance needs to 'learn' about the site conditions and
does so during the commissioning cycle.
Once set, the shower constantly updates it's memory with information about the site
conditions to deliver the best performance.
DO NOT
commission the appliance if water leaks from the unit.
Set Maximum Temperature and Commissioning Cycle
1.
Shower is
OFF
.
Water has
STOPPED
flowing.
Power/Electric is
OFF
.
3.
Turn Power/Electric
ON
.
Within 30 seconds push and hold
FLOW & START/STOP
together.
OFF
ON
2.
Set Maximum Temperature
Turn the dial to the desired position in the
table. This will set the maximum temperature
for showering.
When showering, the set maximum
temperature is reached when the dial is
turned to number '9'.
(See also section: "
BEAB Care
".)
Record the Maximum Temperature setting
on the BEAB Care In-Service Test Record
(separate form supplied) if applicable to the
installation.
B
E
A
B
C
ar
e
Ra
nge
1-5
No.
Max.
Temp
°C
1
37
2
38
3
39
4
40
5
41
6
42
7
45
8
48
BEAB CARE
Содержание Advance ATL J97A
Страница 39: ...39 NOTES...