![Mira Advance ATL J97A Скачать руководство пользователя страница 22](http://html1.mh-extra.com/html/mira/advance-atl-j97a/advance-atl-j97a_installation-manual_1805012022.webp)
22
Basic Post Installation Checks
1.
Turn on electrical
supply.
3.
Temperature to full
cold.
4.
Start shower to test for
water flow. If a shower
drain pump is fitted, it
should also start.
5.
If there is no water
after 5 seconds, make
sure that appliance
has been
primed
.
5 secs
2.
Power to appliance,
check
Start/Stop
for
blue light.
6.
Push
Start/Stop
to
turn off appliance.
Pulsing light and
"beep" indicates that
appliance is shutting
down.
7.
Appliance will purge water from
heater tank for a few seconds.
Important! DO NOT
isolate power
until water has stopped.
Go to section:
"Commissioning"
.
Содержание Advance ATL J97A
Страница 39: ...39 NOTES...