16
1079321-W2-G
14.
Locate the shower unit on the inlet
supplies and push the inlet manifold
onto the pipework until resistance is
felt.
DO NOT FORCE!
Note!
PTFE tape or liquid jointing
compound must not be used and is
not
required to assist connection.
15.
The inlet manifold collet and ‘O’
seals will seal automatically.
Warning!
The shower unit
must
be fixed to the wall at all three
fixing points. The fixing holes are
elongated to assist in vertical and
horizontal alignment.
16.
Screw the shower unit to the wall
using either the wall screws supplied
or alternative fixings depending on
the wall structure.
Do not over tighten!
Make sure that the electrical supply
cable is correctly seated in the
channel in the back of the case.
17.
Connect the live, neutral and earth
conductors of the electrical supply
cable to the terminal block in the
following manner.
L - Live terminal block
N - Neutral terminal block
- Earth terminal block
The earth supply cable must be
sleeved and make sure that all the
terminal connections are tight and
that no insulation is pinched.
18.
Make sure the flow control gear is
set to the
OFF
position by turning
the gear wheel
anticlockwise
until it
stops.
DO NOT
force the gear wheel
as damage will occur.
Gear Wheel
19.
the three cover securing screws.
20.
position.
21.
Insert the temperature indicator trim
and the inner temperature control
knob.
22.
The power thermostatic shower will
now require commissioning, refer to
COMMISSIONING
.
23.
instruction manual supplied with the
Refit the unit cover and secure with
Insert the flow control knob in the OFF
Install the shower fittings, refer to the
fittings.
OFF Position
Temperature
Control Knob
Temperature
Indicator Trim
Arrow / OFF
Position
Inner
Temperature
Control Knob
Содержание 1.1532.327
Страница 30: ...30 1079321 W2 G NOTES...
Страница 31: ...31 1079321 W2 G NOTES...