MSSMD415AE/83413 (1 of 2)
È
LOAD SCOOP SEAL REPLACEMENT
In order to function properly, the load scoop seal (see First Module Assy. dwg.) must be positioned as shown
in Figure 2, with the free edge of the seal resting firmly against the inside of the lip on the Module 1 basket. If seal
replacement becomes necessary (and during initial installation of the load scoop), observe the following procedures:
1. With the CBW empty and the cylinders approximately in the Top Dead Center Position, lock out power to the
CBW.
2. With the power locked out and observing the published safety, precautions ( see safety page ), enter Module
1 through the load scoop.
46
Содержание 76032
Страница 2: ......
Страница 6: ......
Страница 11: ...Safety and Maintenance 1 7 ...
Страница 27: ......
Страница 29: ......
Страница 43: ...Structural and Drive Components 2 39 ...
Страница 48: ...44 ...
Страница 52: ...BMP910003 91132V Page 1 CBW LOAD CHUTE AND SEAL 48 ...
Страница 56: ...BMP910017 91341V Page 1 CBW ENTRY AND EXIT WATER COLLECTORS 52 ...
Страница 60: ...56 ...
Страница 65: ...61 ...
Страница 69: ...Water and Steam Schematics and Devices 3 65 ...
Страница 80: ...76 ...
Страница 100: ......
Страница 101: ...Chemical Supply Devices 4 97 ...
Страница 103: ...99 ...
Страница 106: ......
Страница 107: ...Control and Sensing Assemblies 5 103 ...
Страница 113: ...109 ...
Страница 114: ...110 ...
Страница 117: ...113 ...