CASCADE SET-UP
32
TECHNICAL DOCUMENTATION
CASCADE TEST MODE
•
•
•
•
•
Press and hold the and buttons together for three seconds.
This will send a request to the master boiler to fire all slave boilers.
This can be increased to 100% by pressing the button until the display below is shown.
This test mode can be cancelled by pressing and holding the and buttons again.
These buttons should be held until the display returns to the standard display.
Содержание Ethos RS 350
Страница 2: ......
Страница 42: ...NOTES 42 TECHNICAL DOCUMENTATION...
Страница 43: ...ISO 9001 Registered Quality Management...