COMMISSIONING
CASCADE SET-UP
TECHNICAL DOCUMENTATION
31
CONVERSION FROM NATURAL GAS TO PROPANE
For natural gas to propane conversion, it is only necessary to change the gas volume by altering the CO
2
values as described on pages 28 - 30.
AUTO DETECTION MODE
Cascade structure will need to be auto detected prior to cascading the boilers. Once the boilers have been
detected as indicated below, the number of burners can be confirmed by following the steps below.
•
•
•
•
•
Press and hold the button for three seconds and the display will show:
Once the additional boilers have been identified, the display will change again to indicate it is
loading the parameters to the slave boiler(s).
Once these have been loaded, the master boiler will then request confirmation of the total number
of burners.
This can be confirmed by pressing the button.
Once confirmed, the master boiler will display the normal control display and the slave boiler(s) will
display ‘SLA’ and then the boiler number.
MASTER BOILER
SLAVE BOILER 01
SLAVE BOILER 02
Содержание Ethos RS 350
Страница 2: ......
Страница 42: ...NOTES 42 TECHNICAL DOCUMENTATION...
Страница 43: ...ISO 9001 Registered Quality Management...