INSTALLATION
12
TECHNICAL DOCUMENTATION
REGULATIONS
The appliance should be installed by a competent installer in accordance with the applicable national and
local standards, rules and regulations (please refer to pages 06 and 07 for safety guidelines).
INSTALLATION GUIDELINES
The following guidelines should be complied with;
•
•
•
•
The recommended minimum clearances are as follows:
• 1000mm to the front (to allow free space for movement).
• 400mm above.
• 100mm at the sides.
The device should be installed in a frost free room due to the risk of freezing of the condensate drain.
The built-in protection system is activated when the temperature of the central heating water falls
below 5°C.
Ensure that there is sufficient room around the device for maintenance and the replacement of
components if necessary.
Ensure the base / floor has sufficient load bearing capabilities for the boiler and any other
equipment when full of water.
Содержание Ethos RS 350
Страница 2: ......
Страница 42: ...NOTES 42 TECHNICAL DOCUMENTATION...
Страница 43: ...ISO 9001 Registered Quality Management...