COMMISSIONING
TECHNICAL DOCUMENTATION
29
MAXIMUM LOAD ADJUSTMENT
Press and hold the button for three seconds until the below display appears, the boiler will then start to
operate at minimum load.
To adjust to maximum rate, press and hold until the below display appears, the boiler will then start to
operate at maximum load.
MINIMUM LOAD ADJUSTMENT
Press and hold the button for three seconds until the below display appears, the boiler will then start to
operate at minimum load.
If the boiler is already operating at maximum load (displaying ‘t 100’), then press and hold until the
display reads as above.
To return to normal operating mode, press and hold for three seconds until the boiler returns to the
temperature display.
Press to switch between the bottom and top burners.
Содержание Ethos RS 350
Страница 2: ......
Страница 42: ...NOTES 42 TECHNICAL DOCUMENTATION...
Страница 43: ...ISO 9001 Registered Quality Management...