Manual
LOGO 400
Page 19
©Mikado Modellhubschrauber
8x
M3 x12 #1954
2x
27,5 mm
#2370
2x
23 mm
#2370
2x
M3x14 #1955
2x
M3
#2074
#4184
#4184
6 Tail Boom
6.4 Installation
Bag 6 • Bag 12
For mounting the tail assembly in
the side-frames, pull the rear ends of
the side-frames apart.
For adjusting the gear backlash,
insert a strip of paper between the
main gear and the drive pulley, then
press the drive pulley against the
main gear.
6.5 Tail Rotor Blades
Bag 5
Tighten the screws holding the
tail rotor blades, but ensure that the
blades move easily in the tail rotor
holders under centrifugal force.
Содержание LOGO 400
Страница 21: ...Manual LOGO 400 Page 21 Mikado Modellhubschrauber 6 Tail Boom 6 7 Tail Boom assembled...
Страница 26: ...Manual LOGO 400 Page 26 Mikado Modellhubschrauber 8 Servo Installation 8 7 Aileron Linkage...
Страница 38: ...Manual LOGO 400 Page 38 Mikado Modellhubschrauber 12 RC Installation...
Страница 48: ...Manual LOGO 400 Page 48 Mikado Modellhubschrauber 16 Control Movements 16 3 Elevator 16 4 Aileron...
Страница 49: ...Manual LOGO 400 Page 49 Mikado Modellhubschrauber 17 Overview 17 1 Chassis...
Страница 50: ...Manual LOGO 400 Page 50 Mikado Modellhubschrauber 17 Overview 17 2 Rotor Head...
Страница 51: ...Manual LOGO 400 Page 51 Mikado Modellhubschrauber 17 Overview 17 3 Tail Boom Tail Rotor...
Страница 54: ...Construction Rendering Mehran Mahinpour Tirooni Layout Realisation CDT Berlin www mikado heli de...