Using for the first time
27
Setting up a payment system
If you wish to set up a payment system,
read the chapter “Supervisor level -
Payment system”. These settings can
only be changed during the initial
commissioning process. If you wish to
change the settings later, please
contact Miele Professional Service.
If you do not wish to set up a payment
system, you can skip this step.
11:02
No payment
system
Payment system
OK
Programme
control
Timed
operation
Timed op. +
impul.counter
COM module
Touch the
No payment system
sensor.
The display will change to the next
setting.
Completing the commissioning
process
The commissioning process is
complete when a programme lasting
longer than 20 minutes has been
carried out in full.
If the power is interrupted prior to the
start of the first drying programme
(e.g. if the machine is switched off
with the
button), the initial
commissioning process can be
completed again. Once a drying
programme has been running for over
20 minutes, the initial commissioning
process cannot be performed again.
Confirm with
OK
.
Touch the
Programmes
sensor in
the main menu.
11:02
Automatic
plus
Timed drying
warm air
Basket - Low
temperature
Microfibre
Timed drying
cool air
Basket
programme
Programmes
Select the
Timed drying cool air
programme.
Touch the
Duration
sensor.
OK
00 20
02 59
01 58
01 21
02 22
Duration
h
11:02
Reset
Place your finger on the number that
you want to change and move your
finger in the desired direction.
Select a duration of 20 minutes.
Confirm with
OK
.
Touch the flashing
Start/Stop
sensor.
After the programme has finished, the
tumble dryer is ready for use.
Содержание PDR 908 EL
Страница 96: ...M Nr 11 226 810 02 en AU NZ PDR 908 EL ...