![Miele professional PW 413 SES Скачать руководство пользователя страница 51](http://html1.mh-extra.com/html/miele-professional/pw-413-ses/pw-413-ses_operating-and-installation-instructions_1793182051.webp)
Installation and connection
51
Care must be taken to drill through the first wall (1) only, as there is a
deflecting wall (2) 10 mm behind it.
If the drilled out connections are no longer required, they must be
resealed.
Connections
3
to
12
are provided for liquid dispensing. These
connections are sealed and must be cut to suit the diameter of the
hose with a suitable hacksaw. If opened connections are no longer
required, they must be resealed.
Water drainage
DN 70 drain valve
AV
on the machine, DN 70 sleeve on-site.
Throughflow rate 200 l/min.
If the slope for drainage is extremely steep, the piping must be vented
to prevent formation of a vacuum in the machine's drain system.
Foam and vapour venting kit
BWS
If excessive suds form, foam may escape from the vapour vent. To
remove the foam, an optional vapour venting kit (BWS) can be used.
Содержание PW 413 SES
Страница 73: ...73...