Light Commercial R410A on-off
DM17-01.01.08en
167
11. Test operation
11.1 The test operation must be carried out after the entire installation has been
completed.
11.2 Please confirm the following points before the test operation.
The indoor unit and outdoor unit are installed properly.
Tubing and wiring are correctly completed.
The refrigerant pipe system is leakage-checked.
The drainage is unimpeded.
The ground wiring is connected correctly.
The length of the tubing and the added stow capacity of the refrigerant have been recorded.
The power voltage fits the rated voltage of the air conditioner.
There is no obstacle at the outlet and inlet of the outdoor and indoor units.
The gas-side and liquid-side stop values are both opened.
The air conditioner is pre-heated by turning on the power.
11.3 Test operation
Set the air conditioner under the mode of "COOLING" by remote controller, and check the following points.
Indoor unit
Whether the switch on the remote controller works well.
Whether the buttons on the remote controller works well.
Whether the air flow louver moves normally.
Whether the room temperature is adjusted well.
Whether the indicator lights normally.
Whether the temporary buttons works well.
Whether the drainage is normal.
Whether there is vibration or abnormal noise during operation.
Outdoor unit
Whether there is vibration or abnormal noise during operation.
Whether the generated wind, noise, or condensed of by the air conditioner have influenced your
neighborhood.
Whether any of the refrigerant is leaked.
Содержание MUE-36HRN1-R1
Страница 13: ...Light Commercial R410A on off DM17 01 01 08en 13 Dimensions 3...
Страница 14: ...DM17 01 01 08en Light Commercial R410A on off 14 Service Space 4...
Страница 18: ...DM17 01 01 08en Light Commercial R410A on off 18 Wiring Diagrams 7 MCA3 12HRN1 Q1 MCA3 18HRN1 Q1...
Страница 22: ...DM17 01 01 08en Light Commercial R410A on off 22 Field Wiring 11...
Страница 29: ...Light Commercial R410A on off DM17 01 01 08en 29 4 Service Space 1000mm 1000mm 1000mm 1000m m...
Страница 35: ...Light Commercial R410A on off DM17 01 01 08en 35 6 Wiring Diagrams MCD 18HRN1 Q1 MCD 24HRN1 Q1...
Страница 36: ...DM17 01 01 08en Light Commercial R410A on off 36 MCD 36HRN1 R1...
Страница 37: ...Light Commercial R410A on off DM17 01 01 08en 37 MCD 48HRN1 R MCD 60HRN1 R...
Страница 41: ...Light Commercial R410A on off DM17 01 01 08en 41 10 Field Wiring MCD 18HRN1 Q1 MCD 24HRN1 Q1...
Страница 42: ...DM17 01 01 08en Light Commercial R410A on off 42 MCD 36HRN1 R1 MCD 48HRN1 R MCD 60HRN1 R...
Страница 55: ...Light Commercial R410A on off DM17 01 01 08en 55 6 Wiring Diagrams MTB 18HWN1 Q1 MTB 24HWN1 Q1...
Страница 56: ...DM17 01 01 08en Light Commercial R410A on off 56 MTI 36HWN1 R1 MTB 48HWN1 R MTB 60HWN1 R...
Страница 63: ...Light Commercial R410A on off DM17 01 01 08en 63 11 Field Wiring MTB 18HWN1 Q1 MTB 24HWN1 Q1...
Страница 64: ...DM17 01 01 08en Light Commercial R410A on off 64 MTI 36HWN1 R MTB 48HWN1 R MTB 60HWN1 R...
Страница 76: ...DM17 01 01 08en Light Commercial R410A on off 76 6 Wiring Diagrams MHG 24HWN1 Q1...
Страница 77: ...Light Commercial R410A on off DM17 01 01 08en 77 MHG 36HWN1 R1...
Страница 78: ...DM17 01 01 08en Light Commercial R410A on off 78 MHG 48HWN1 R...
Страница 79: ...Light Commercial R410A on off DM17 01 01 08en 79 MHG 60HWN1 R...
Страница 84: ...DM17 01 01 08en Light Commercial R410A on off 84 11 Field Wiring MHG 24HWN1 Q1 MHG 36HWN1 R1...
Страница 85: ...Light Commercial R410A on off DM17 01 01 08en 85 MHG 48HWN1 R MHG 60HWN1 R...
Страница 91: ...Light Commercial R410A on off DM17 01 01 08en 91 4 Service Space...
Страница 98: ...DM17 01 01 08en Light Commercial R410A on off 98 6 Wiring Diagram MUE 12HRN1 Q1 MUE 18HRN1 Q1 MUE 24HRN1 Q1...
Страница 99: ...Light Commercial R410A on off DM17 01 01 08en 99 MUE 36HRN1 R1 MUE 48HRN1 R MUE 60HRN1 R...
Страница 103: ...Light Commercial R410A on off DM17 01 01 08en 103 10 Field Wiring MUE 12HRN1 Q1 MUE 18HRN1 Q1 MUE 24HRN1 Q1...
Страница 104: ...DM17 01 01 08en Light Commercial R410A on off 104 MUE 36HRN1 R1 MUE 48HRN1 R MUE 60HRN1 R...
Страница 109: ...Light Commercial R410A on off DM17 01 01 08en 109 3 Dimensions Dimension Model W mm D mm H mm 24 500 315 1700 H W D...
Страница 110: ...DM17 01 01 08en Light Commercial R410A on off 110 4 Service Space...
Страница 112: ...DM17 01 01 08en Light Commercial R410A on off 112 6 Wiring Diagrams MFM 24ARN1 Q...
Страница 124: ...DM17 01 01 08en Light Commercial R410A on off 124 5 Wiring Diagrams MOBA30U 12HN1 Q MOBA30U 18HN1 Q MOCA30U 24HN1 Q...
Страница 125: ...Light Commercial R410A on off DM17 01 01 08en 125 MOD31U 36HN1 R MOU 48HN1 R...
Страница 126: ...DM17 01 01 08en Light Commercial R410A on off 126 MOUA 60HN1 R...
Страница 178: ...DM17 01 01 08en Light Commercial R410A on off 178 2 1 5 Display board of floor standing...