7. Vacuum Drying and Leakage Checking
7.1 Purpose of vacuum drying
Eliminating moisture in system to prevent the phenomena of ice-blockage and copper oxidation.
Ice-blockage shall cause abnormal operation of system, while copper oxide shall damage compressor.
Eliminating the non-condensable gas (air) in system to prevent the components oxidizing, pressure
fluctuation and bad heat exchange during the operation of system.
7.2 Selection of vacuum pump
The ultimate vacuum degree of vacuum pump shall be -756mmHg or above.
Precision of vacuum pump shall reach 0.02mmHg or above.
7.3 Operation procedure for vacuum drying
Due to different construction environment, two kinds of vacuum drying ways could be chosen, namely
ordinary vacuum drying and special vacuum drying.
7.3.1 Ordinary vacuum drying
1. When conduct first vacuum drying, connect pressure gauge to the infusing mouth of gas pipe and liquid
pipe, and keep vacuum pump running for 1hour (vacuum degree of vacuum pump shall be reached
-755mmHg).
2 If the vacuum degree of vacuum pump could not reach -755mmHg after 1 hour of drying, it indicates
that there is moisture or leakage in pipeline system and need to go on with drying for half an hour.
3 If the vacuum degree of vacuum pump still could not reach -755mmHg after 1.5 hours of drying, check
whether there is leakage source.
4 Leakage test: After the vacuum degree reaches -755mmHg, stop vacuum drying and keep the pressure
for 1 hour. If the indicator of vacuum gauge does not go up, it is qualified. If going up, it indicates that
there is moisture or leak source.
7.3.2 Special vacuum drying
The special vacuum drying method shall be adopted when:
1. Finding moisture during flushing refrigerant pipe.
2. Conducting construction on rainy day, because rain water might penetrated into pipeline.
3. Construction period is long, and rain water might penetrated into pipeline.
4. Rain water might penetrate into pipeline during construction.
Procedures of special vacuum drying are as follows:
1. Vacuum drying for 1 hour.
2. Vacuum damage, filling nitrogen to reach 0.5Kgf/cm2 .
Because nitrogen is dry gas, vacuum damage could achieve the effect of vacuum drying, but this
method could not achieve drying thoroughly when there is too much moisture. Therefore, special
attention shall be drawn to prevent the entering of water and the formation of condensate water.
3. Vacuum drying again for half an hour.
If the pressure reached -755mmHg, start to pressure leakage test. If it can not reached the value,
repeat vacuum damage and vacuum drying again for 1 hour.
4
Leakage test: After the vacuum degree reaches -755mmHg, stop vacuum drying and keep the
pressure for 1 hour. If the indicator of vacuum gauge does not go up, it is qualified. If going up, it
indicates that there is moisture or leak source.
Содержание MUE-36HRN1-R1
Страница 13: ...Light Commercial R410A on off DM17 01 01 08en 13 Dimensions 3...
Страница 14: ...DM17 01 01 08en Light Commercial R410A on off 14 Service Space 4...
Страница 18: ...DM17 01 01 08en Light Commercial R410A on off 18 Wiring Diagrams 7 MCA3 12HRN1 Q1 MCA3 18HRN1 Q1...
Страница 22: ...DM17 01 01 08en Light Commercial R410A on off 22 Field Wiring 11...
Страница 29: ...Light Commercial R410A on off DM17 01 01 08en 29 4 Service Space 1000mm 1000mm 1000mm 1000m m...
Страница 35: ...Light Commercial R410A on off DM17 01 01 08en 35 6 Wiring Diagrams MCD 18HRN1 Q1 MCD 24HRN1 Q1...
Страница 36: ...DM17 01 01 08en Light Commercial R410A on off 36 MCD 36HRN1 R1...
Страница 37: ...Light Commercial R410A on off DM17 01 01 08en 37 MCD 48HRN1 R MCD 60HRN1 R...
Страница 41: ...Light Commercial R410A on off DM17 01 01 08en 41 10 Field Wiring MCD 18HRN1 Q1 MCD 24HRN1 Q1...
Страница 42: ...DM17 01 01 08en Light Commercial R410A on off 42 MCD 36HRN1 R1 MCD 48HRN1 R MCD 60HRN1 R...
Страница 55: ...Light Commercial R410A on off DM17 01 01 08en 55 6 Wiring Diagrams MTB 18HWN1 Q1 MTB 24HWN1 Q1...
Страница 56: ...DM17 01 01 08en Light Commercial R410A on off 56 MTI 36HWN1 R1 MTB 48HWN1 R MTB 60HWN1 R...
Страница 63: ...Light Commercial R410A on off DM17 01 01 08en 63 11 Field Wiring MTB 18HWN1 Q1 MTB 24HWN1 Q1...
Страница 64: ...DM17 01 01 08en Light Commercial R410A on off 64 MTI 36HWN1 R MTB 48HWN1 R MTB 60HWN1 R...
Страница 76: ...DM17 01 01 08en Light Commercial R410A on off 76 6 Wiring Diagrams MHG 24HWN1 Q1...
Страница 77: ...Light Commercial R410A on off DM17 01 01 08en 77 MHG 36HWN1 R1...
Страница 78: ...DM17 01 01 08en Light Commercial R410A on off 78 MHG 48HWN1 R...
Страница 79: ...Light Commercial R410A on off DM17 01 01 08en 79 MHG 60HWN1 R...
Страница 84: ...DM17 01 01 08en Light Commercial R410A on off 84 11 Field Wiring MHG 24HWN1 Q1 MHG 36HWN1 R1...
Страница 85: ...Light Commercial R410A on off DM17 01 01 08en 85 MHG 48HWN1 R MHG 60HWN1 R...
Страница 91: ...Light Commercial R410A on off DM17 01 01 08en 91 4 Service Space...
Страница 98: ...DM17 01 01 08en Light Commercial R410A on off 98 6 Wiring Diagram MUE 12HRN1 Q1 MUE 18HRN1 Q1 MUE 24HRN1 Q1...
Страница 99: ...Light Commercial R410A on off DM17 01 01 08en 99 MUE 36HRN1 R1 MUE 48HRN1 R MUE 60HRN1 R...
Страница 103: ...Light Commercial R410A on off DM17 01 01 08en 103 10 Field Wiring MUE 12HRN1 Q1 MUE 18HRN1 Q1 MUE 24HRN1 Q1...
Страница 104: ...DM17 01 01 08en Light Commercial R410A on off 104 MUE 36HRN1 R1 MUE 48HRN1 R MUE 60HRN1 R...
Страница 109: ...Light Commercial R410A on off DM17 01 01 08en 109 3 Dimensions Dimension Model W mm D mm H mm 24 500 315 1700 H W D...
Страница 110: ...DM17 01 01 08en Light Commercial R410A on off 110 4 Service Space...
Страница 112: ...DM17 01 01 08en Light Commercial R410A on off 112 6 Wiring Diagrams MFM 24ARN1 Q...
Страница 124: ...DM17 01 01 08en Light Commercial R410A on off 124 5 Wiring Diagrams MOBA30U 12HN1 Q MOBA30U 18HN1 Q MOCA30U 24HN1 Q...
Страница 125: ...Light Commercial R410A on off DM17 01 01 08en 125 MOD31U 36HN1 R MOU 48HN1 R...
Страница 126: ...DM17 01 01 08en Light Commercial R410A on off 126 MOUA 60HN1 R...
Страница 178: ...DM17 01 01 08en Light Commercial R410A on off 178 2 1 5 Display board of floor standing...