7. Installation details
7.1 Wrench torque sheet for installation
Outside diameter
Torque
mm inch Kg
f.
m
Ф
6.35 1/4 1.8
Ф
9.52 3/8 4.2
Ф
12.7 1/2 5.5
7.2 Connecting the cables
The power cord of connect should be selected according to the following specifications sheet.
Grade
Unit 9K 12K
mm
2
1.5
1.5
7.3 Pipe length and the elevation
Pipe size
Capacity
Btu/h
G
as
Liquid
Standard
length
(m)
Max.
Elevation
B (m)
Max.
Length
A (m)
Additional
refrigerant
(g/m)
9k 3/8’’
(
Ф
9.52) 1/4’’
(
Ф
6.35) 5
8
20
20
12k 3/8’’
(
Ф
9.52) 1/4’’
(
Ф
6.35) 5
8
20
20
Caution:
Capacity is based on standard length and maximum allowance length is base of reliability.
Oil trap should be installed per 5-7 meters.
7.4 Air purging of the piping and indoor unit
Required tools:
Hexagonal wrench; adjustable wrench; torque wrenches, wrench to hold the joints and gas leak detector.
Note:
Содержание MS9A-09HRDN1-QC2
Страница 3: ...10 1 Indoor Unit Error Display 31 10 2 Diagnosis and Solution 32 10 3 Key parts checking 40...
Страница 10: ...7 3 2 Outdoor Unit MOR 09 12HDN1 QC2...
Страница 12: ...9 5 Refrigerant cycle diagram...
Страница 13: ...10 6 Wiring diagram 6 1 Indoor Unit MS9A 09 12HRDN1 QC2...
Страница 14: ...11 6 2 Outdoor Unit MOR 09 12HDN1 QC2...
Страница 40: ...37...