![Midea LSBLG255/MZ Скачать руководство пользователя страница 87](http://html1.mh-extra.com/html/midea/lsblg255-mz/lsblg255-mz_technical-and-service-manual_1790907087.webp)
DX type water-cooled screw chiller (PCB Control)
MCAC-CTSM-2014-03
86
especially various wiring ports, for cleanness. If the communication lines of the PCB and control
screen are damaged, refer to the diagram below.
8) After the inspection for all the above items is complete, connect the control cabinet and the
supply indication lamp will light up, indicating that the oil heater is working. Observe whether
the phase loss protection is in normal condition, if it is (green light on), close the single-pole
switch in the control cabinet, then the control circuit begins working, and the touch screen and
PCB control are put into operation.
9) Before start up the machine, inspect whether the external system of the unit meets the
conditions for start-up (e.g. whether the water cooling pump of the system is externally
controlled or interlocked with the master compressor, and that the water pump must be started
before starting up the master compressor via external control).
10) Inspect whether the compressor overload protection value, which shall not exceed the
maximum compressor permissible current value indicated in the nameplate on the compressor,
is set correctly. The compressor overload protection value generally equals to the set value of
heat relay multiplied by variable ratio of current inductor, which is (250/5)50 in the following
case.
11) Inspect whether the value of phase loss and reversal protection is set correctly. The
over-/under-voltage protection value shall be ±10% of the rated voltage.
(3) Refrigeration System Inspection
1) The discharge line valve and suction line valve of the compressor must be fully open (turn
anticlockwise to open) and the cores shall be tightly locked to prevent leakage of refrigerant.
2) Inspect whether moisture content of the system exceeds the limit
Excessive moisture content in the refrigerant system of the unit might cause ice block, copper
plating, etc. that would seriously affect the safety of the unit. Therefore, the dryness of the
refrigerant system of the unit shall be inspected from the sight glass before and during
operation of the unit, purple indicating dry, and pink moist, as shown in the right figure. When
the color turns red, the filter core in the unit shall be replaced with a dry one.
The discharge line valve and
suction line valve shall be open
(both valves in the figure are
closed, and shall be opened
before start-up).
The discharge line valve and
suction line valve shall be
open (both valves in the figure
are closed, and shall be
opened before start-up).
Содержание LSBLG255/MZ
Страница 1: ...LSBLG MZ Model TechnicalServiceManual Water cooled Screw Chiller ...
Страница 15: ...DX type water cooled screw chiller PCB Control MCAC CTSM 2014 03 14 For single head unit LSBLG860 MZ ...
Страница 16: ...MCAC CTSM 2014 03 DX type water cooled screw chiller PCB Control 15 For dual heads unit LSBLG970 1260 MZ ...
Страница 17: ...DX type water cooled screw chiller PCB Control MCAC CTSM 2014 03 16 For dual heads unit LSBLG1490 MZ ...