MCAC-ATSM-2013-11 Aqua Tempo Power Series (with LAK) air cooled scroll chiller unit (50Hz)
111
of micro switches are connected, otherwise micro switches may suffer displacement, thus leading to failure
of flow switches.
d. Special grounding screws should be used for earth connection. Bolts should not be installed or removed
at will; otherwise flow switches may suffer deformation and failure.
e. Flow switches have been set at minimal flow value before leaving the factory. They should not be adjusted
below the setting value at the factory, or they may suffer failure. After installing flow switches, please press
the flow switch lever several times to check them. When the lever is found not to respond with
“
clatter”,
rotate the screw in a clockwise direction, until “clatter” occurs.
f. Be sure to determine the model of target slice according to the rated flow of the unit, the diameter of the
outlet pipe and the adjustment range of the target slice of the flow switch. Besides, the target slice should not
contact with other restrictors in the pipeline or on the inner wall of the pipeline, or the flow switch cannot be
reset normally.
● Determine whether the flow switch and the system connected with it are in good operation according to the
measured value by flow meter, namely, when the measured value on flow meter is less than 60% of rated
water flow of the unit, the water flow switch should be cut off and observed for 3 working periods, and it
should be covered with flow switch shell timely.
Schematic diagram of water flow switch
12.2.4 Installation of water system pipeline for 30kW module
Installation of single-module water system pipeline
Installation of multi-module water system pipeline
1)
Installation mode I (recommended installation mode)
Содержание Aqua Tempo Super Series
Страница 37: ...Aqua Tempo Power Series with LAK air cooled scroll chiller unit 50Hz MCAC ATSM 2013 11 36 130kW module...
Страница 38: ...MCAC ATSM 2013 11 Aqua Tempo Power Series with LAK air cooled scroll chiller unit 50Hz 37 200kW module...
Страница 39: ...Aqua Tempo Power Series with LAK air cooled scroll chiller unit 50Hz MCAC ATSM 2013 11 38 250kW module...
Страница 45: ...Aqua Tempo Power Series with LAK air cooled scroll chiller unit 50Hz MCAC ATSM 2013 11 44 200kW module...
Страница 48: ......
Страница 62: ...MCAC ATSM 2013 11 Aqua Tempo Power Series with LAK air cooled scroll chiller unit 50Hz 61...
Страница 69: ...Aqua Tempo Power Series with LAK air cooled scroll chiller unit 50Hz MCAC ATSM 2013 11 68...
Страница 71: ...Aqua Tempo Power Series with LAK air cooled scroll chiller unit 50Hz MCAC ATSM 2013 11 70 MGBL D65W RN1...
Страница 72: ...MCAC ATSM 2013 11 Aqua Tempo Power Series with LAK air cooled scroll chiller unit 50Hz 71...
Страница 74: ...MCAC ATSM 2013 11 Aqua Tempo Power Series with LAK air cooled scroll chiller unit 50Hz 73 10 4 MGBL F130W RN1...
Страница 77: ...Aqua Tempo Power Series with LAK air cooled scroll chiller unit 50Hz MCAC ATSM 2013 11 76 10 5 MGBL F200W RN1...
Страница 80: ...MCAC ATSM 2013 11 Aqua Tempo Power Series with LAK air cooled scroll chiller unit 50Hz 79 10 6 MGBL F250W RN1...
Страница 100: ...MCAC ATSM 2013 11 Aqua Tempo Power Series with LAK air cooled scroll chiller unit 50Hz 99 55 60 65kW module 130kW module...