GREER COMPANY
GREER COMPANY
GREER COMPANY
GREER COMPANY
Crane Systems
GREER COMPANY
1918 EAST GLENWOOD PLACE, SANTA ANA, CA 92705
PN W450250 Rev B 08/09/00
RCI 510 RATED CAPACITY INDICATOR OPERATOR'S MANUAL
TEL:(714) 259-9702 FAX:(714) 259-7626
19 of 35
SYSTEM SETUP
SYSTEM SETUP
SYSTEM SETUP
SYSTEM SETUP
CHOOSING THE POINT
CHOOSING THE POINT
CHOOSING THE POINT
CHOOSING THE POINT OF LIFT
OF LIFT
OF LIFT
OF LIFT
Before choosing the point of lift, check that the correct winch has been selected.
Always check the point of lift selection following selection of the winch.
•
Choose the point of lift to be either from the
main boom, auxiliary head, or jib by pressing
the
point of lift
push button
(item 14).
This action moves the selected lifting point
to the next available lifting point, i.e. from jib
to aux head, from aux head to main boom,
and from main boom back to jib again.
If an option is not available, it will be
skipped over.
If no other pick point options are
available, the message "No other pick
point options" will be displayed on the
information screen (item 1).
TEST
MAX
SET
6
23,500
i2,300
44.8
62.7
26.4
1
14
ORs Full
9.7Klb Ctwt
ERECTED 60' TELEJIB 17 AUXHD ON
PICK FROM MAIN BOOM FRONT WINCH
360
o
o