36
37
Veri-Q PREP M16 G2-16TU
User Manual
13. Maintenance Checklist
4. Semiannual Checklist (through MiCo BioMed staff)
Checklist
Pass
Fail
The air pump pressure has been checked and calibrated if necessary.
The discharge amount of the buffer has been checked and calibrated if necessary.
The equipment has been checked for any contamination and cleansed if necessary.
※
If the equipment cannot be calibrated on the basis of the inspection, the equipment is to be
recovered from the client and inspected by the manufacturer.
Equipment Checklist
1. Daily Checklist
Checklist
Pass
Fail
The equipment is in the designated location.
There are no foreign objects or leaks around the equipment.
The device is not exposed to direct sunlight.
There are no installations that can cause dust, heat, and fluid inflow into the equipment.
The port switch direction on the rear of the equipment is correct.
The solution bottle contains no foreign substances.
There are no objects on the equipment that can cause LCD damage.
The washing condition of the pre-run cartridge has been checked.
The cap of the solution storage bottle of the equipment is closed after operation.
※
For any failed items, contact the equipment manager.
2. Monthly Checklist
Checklist
Pass
Fail
The equipment is free of contamination.
The solution storage bottle is clean.
※
For any failed items, contact the equipment manager.
3. Quarterly Checklist
Checklist
Pass
Fail
The collet (rubber cover for pressurizing the sample tube) has been replaced.
※
Contact the manufacturer for more collets.