![MHS Boilers ADI LT Скачать руководство пользователя страница 54](http://html1.mh-extra.com/html/mhs-boilers/adi-lt/adi-lt_installation-operation-and-maintenance-manual_1783512054.webp)
ADI LT boiler - Technical Manual
Page
L338
11/2011
54
18. BOILER GUARANTEE
1. MHS Boilers
guarantees the ADI LT boilers of its own manufacturing as follows:
* 3 years for the boiler heat exchanger
* 2 years for the rest of components
2. Please check MHS Terms and Conditions for Warranty commencement information.
3. The
COMMISSIONING
is not included in the price of the boiler. It must be realized by the Official Technical
Assistance Services of MHS Boilers that will also check if the installation complies with the minimum
requirements for the boiler correct operation.
4. Repairing or replacing components or parts of the boiler does not extend the period of the guarantee, neither
for the pieces that are replaced.
5. The elements in guarantee will be repaired or replaced freely in case of manufacturing faults.
6. The Official Technical Assistance Services are the only competent services that can carry out repairs under
guarantee and Mhs Boilers will send its technical staff according to its own internal organization planning.
7. The parts replaced under guarantee will remain property of MHS Boilers, and the user is obliged to return them
to MHS Boilers free of charges within a maximum period of 7 days, otherwise the spare parts provided will be
invoiced.
8. The guarantee just covers the material repairing. The guarantee does not cover the expenses for the
dismantling of the equipments, for the installation and/or for the local or premises where they are installed,
neither for the connections of the new equipments, or for additional works necessary to repair the material.
9.
In order to consider as “GUARANTEE” the spare parts or the replaced components of the boilers, the
installation should comply with the requirements described in this manual.
Guarantee will not be valid when breakdowns are due to:
A. No correct installation, no proper use, inadequate manipulation or maintenance of the boiler.
B.
Electric supply
different from: 220/230 V, 50Hz, single phase, earth connection.
C.
No correct sizing or execution of the chimney
and of the flues outlets. Bad evacuation of the
condensed products generated by the smokes in the chimney.
D.
Force majeure
such as: fire, flood, sinking, freezing of the circuit water...
E.
No proper water quality requirements
both for the water of the circuit and the water supplied. Values
must be:
-
Total hardness (TH): lower than 12ºF
-
PH: between 9,6 and 10
-
Iron content: lower than 1 mg/litre
-
Resistivity: higher than 2000 Ohms*cm (conductivity lower than 500 microS/cm)
-
Turbidity: lower than 10 mg/litre
-
Salinity: lower than 50 mg/litre
-
Chloride: lower than 100 mg/litre
Or water refillings to boilers circuit exceeds the maximum volume allowed of refilling water of
the installation (see paragraph in this document).
Содержание ADI LT
Страница 1: ...L338 11 2011 INSTALLATION OPERATION AND MAINTENANCE MANUAL ADI LT LOW TEMPERATURE BOILER ...
Страница 29: ...ADI LT boiler Technical Manual Page L338 11 2011 29 12 1 ELECTRIC DRAWING ADI LT 105 ADI LT 200 ...
Страница 30: ...ADI LT boiler Technical Manual Page L338 11 2011 30 12 2 ELECTRIC DRAWING ADI LT 250 ADI LT 325 ...
Страница 31: ...ADI LT boiler Technical Manual Page L338 11 2011 31 12 3 ELECTRIC DRAWING ADI LT 400 ADI LT 750 ...
Страница 59: ...L338 11 2011 ...