
Mountings
In-Ground Mounting
Assembly Instructions (MPP)
•
All MHP Grill Heads may be mounted on the 4 foot post
for in-ground installation.
•
The gas supply may be either LP or Natural.
•
The grill head should not be attached to the post until
the
post is permanently cemented in ground.
Please check to be sure that all parts are included before pro-
ceeding. Contact your dealer if any parts are missing.
Parts
Quantity
4' Post
1
Post access door
1
28” Stainless Steel Tubing
1
Stainless Steel Grease Cup
1
Stainless Grease Cup Holder
1
¼ - 20 x ¾" Hex Head Bolts
3
¼ - 20 Kep Nuts
3
Step 1: In-Ground Mounting Installation
(Fig. 9)
1.
Dig a posthole about 8 inches wide by 2 feet deep
. Cau-
tion: Locate the hole so that the mounted grill head has
a clearance of 18 inches away from any combustible
object or surface; back, left or right.
Center the post in the hole and plumb it. Pour in cement
(gravel) up to the gas line access hole
.
When you complete the mount assembly go to the appro-
priate Grill Assembly Section and assemble the grill
head.
Keep in mind that the gas line access hole is on
the back of the post and the notch at the top if facing front.
Recheck plumb and allow cement to set.
2. Run the gas supply line into the post access hole (just above
the cement). Make a 90° bend to reach the access door
opening.
The gas supply line should be trenched at least 18
inches below the surface of the ground to prevent damage
from digging.
CAUTION: The gas supply line must be reg-
ulated (in the case of natural gas that means connected
after your gas meter and regulator) and that you have an
easily accessible shut-off valve.
3. At the access door connect a 3/8" flare coupling (not supplied
by MHP) to the gas supply line and Stainless Steel tubing.
Position the tubing in the top notch of the post. Bend the
tubing at the top end to match the Feed Line of the grill valve.
Do
not kink the tubing.
Step 2: Attaching The Grill Head Bottom To The In-
Ground Post
(Fig. 7 & 8)
To attach the grill head to the post please refer to Step 3 of the
Deck/Patio installation procedures on page 8 and follow instruc-
tions.
When you complete the mount assembly Go to the appropri-
ate Grill head section and assemble the Grill Head.
TUBE BENDING
: For proper bending of the stainless steel tubing, see
page 26 (
Fig. 47
) for bending instructions.
3. Mount the grease cup holder to the rear flange hole with a
¼ -
20
x ¾" bolt and ¼-20 Kep nut. The grease cup holder is sup-
plied with the grill head.
9
18”
6”
Содержание JNR4DD Series
Страница 33: ...Parts Information TJK LID STAINLESS DROP DOWN SHELF IDENTIFICATION GGDDSSUS 33 32...
Страница 36: ...NOTES 36...