MHG Heating Ltd ©
MHG Heating Ltd. Unit 4 Epsom Downs Metro Centre, Waterfield Tadworth Surrey KT20 5LR
P: 08456 448802 F: 08456 448803 E:[email protected] W:
www.mhgheating.co.uk
01/01/10
47
5. Punch the two drainage holes at each bottom corner of the collector, according
to how it is mounted, with the aid of a slotted screwdriver.
To do so, punch at the bottom edge.
To ensure that water can drain properly from the collector, it is absolutely
essential that all drainage holes are punched at the bottom corners (depending on
how the collector is mounted on the roof).