9.1 Controls
1 Lock of the electric box
2 Speed selector switches (only for two-phase motors)
3 START button
4 Operation indicator
5 Main switch
6 Connection pedals
7 Electric cables
8 Mains connection
9 Spindle for height adjustment of the upper roller
10 EMERGENCY STOP button
11 Electric box
12 Pedals for controlling the rollers
13 Connection cable control panel
Fig. 14: Controls
Start the ring bending machine
The following steps set the ring bending machine to operational readiness:
Step 1: Connect the mains plug to the power source. Check that all electrical
connections are correct.
Step 2: Set the main switch (5) on the electrical box from "0" to "1". The indica-
tor (4) lights up.
Step 3: Press the START button (3). The machine is ready for operation.
Step 4: Press the rollers with the pedals.
NOTE!
Please observe the following before operating the machine.
- The mains voltage must correspond to the voltage specifi-
cations on the rating plate.
- The main switch must be set to "0".
- The safety devices as well as the protective covers must be
functional.
Содержание PRM 30 F
Страница 1: ...PRM 30 F Operating Instructions PRM 30 F PRM F Ring Bending Machine PRM 31 F PRM 35 F...
Страница 30: ...30 PRM F Version 1 07 EN Operation 9 7 Bending tolerances of different profiles...
Страница 37: ...Spare parts PRM F Version 1 07 EN 37 Fig 27 Spare parts drawing 2 PRM 30 F...
Страница 38: ...38 PRM F Version 1 07 EN Spare parts 12 3 Spare parts drawing PRM 31 F Fig 28 Spare parts drawing 1 PRM 31 F...
Страница 39: ...Spare parts PRM F Version 1 07 EN 39 12 4 Spare parts drawing PRM 35 F Fig 29 Spare parts drawing 1 PRM 35 F...
Страница 41: ...Electrical wiring diagrams PRM F Version 1 07 EN 41 Fig 31 Electrical circuit diagram 2 for PRM 30 F...
Страница 46: ...46 PRM F Version 1 07 EN Electrical wiring diagrams Fig 36 Electrical wiring diagram 2 for PRM 35 F...
Страница 48: ...www metallkraft de...