background image

P 9

Please retain product label and instructions for future reference

             

22

Step 13

Parts needed - No. 22 QTY 4

Ensuring the roof boards are flush

at the overhanging side and meet

at the apex, fix the eaves frames 

(No. 22) to the underside of the roof

boards using 9x40mm screws as 

shown in the illustration

*Please Note: 

This image is for 

illustrative purposes and may 

differ from your choice in 

product. Nevertheless the process 

of fixing the eaves frames is the

same.

36x40mm Screws 

40mm 

screw

Pre drill 

hole

23b

18

18

18

a

b

Step 12

Parts needed - No. 18 QTY 98

 

Place the first two roof boards

(No. 18) onto the assembly on 

each side, making sure the boards

are flush to the end of the roof

purlin. Once in position fix to each 

purlin using 3x40mm screws.

Due to natural occurences of

wood shrinkage / expansion. 

You maybe required to use the 

provided spacers and place a 

space of 2mm to ensure every 

roof board lines up with the truss’.

*Ensure the roof boards meet

at the top of the apex and leave

an overhang at the bottom.

Continue adding the roof boards

along the roof, fixing each one into

position using 3x40mm screws,

making sure that each board is 

interlocked, flush at the bottom &

meet at the top of the apex.

 

The last board on each 

side will overhang: Using a 

staight edge and a pencil mark 

out a line as a guide. 

Cut along the pencil mark and

remove the excess. Place the

cut down board’s back onto the

roof and secure into place

using 3x40mm screws per

board.

*Please Note: 

This image is for illustrative 

purposes and may differ from your choice in 

product. Nevertheless the process of cutting

and fitting the last roof boards is the same.

294x40mm Screws 

40mm 

screw

Pre drill 

hole

*

Cut to fit

a

b

Содержание 0644LOG186-V4

Страница 1: ...cur during excessive dry spells due to an interior moisture loss Unfortunately these processes cannot be avoided but can be helped It is suggested that the outdoor building is sprayed with water durin...

Страница 2: ...4x130mm QTY 84 LB44 C 130 Log Board 120x44x5500mm QTY 18 LB44 A 5500 Log Board 120x44x4000mm QTY 10 LB44 A 4000 Log Board 120x44x474mm QTY 28 LB44 B 474 Log Board 120x44x1896mm QTY 28 LB44 B 1896 15 1...

Страница 3: ...ggered pattern Before securing ensure that the boards are fitted properly in their respective tongues and grooves Nail Bag 40mm Screw x882 30mm Screw x108 120mm Screw x16 P 3 Please retain product lab...

Страница 4: ...her at each corner using 8x70mm screws ensuring the frame is flush Ensure the 58mm side of the bearer is laying on the base so that you can screw the bearers together on the 44mm side 8x70mm Screws b...

Страница 5: ...ide of the door and window openings can be placed either side depending on your needs Step 5 See Pre Assembly Parts needed No 9 QTY 12 No 10 QTY 36 No 11 QTY 6 No 13 QTY 12 No 14 QTY 12 Following the...

Страница 6: ...ons for future reference Step 6 See Window Assembly Parts needed No 1 QTY 8 Refer to window assembly instructions to assemble windows Step 7 Parts needed No 1 QTY 8 Ensure that the lip of the window f...

Страница 7: ...embly Parts needed No 9 QTY 14 No 10 QTY 42 No 11 QTY 9 No 13 QTY 14 No 14 QTY 14 No 15 QTY 1 No 16 QTY 2 Following the same method outlined in Pre Assembly lay the remaining boards No s 9 10 11 13 14...

Страница 8: ...per purlin Please note The gable shown is for illustrative purposes and may differ in width from your choice in product Nevertheless despite any differences the process of fixing the roof purlins is...

Страница 9: ...s Due to natural occurences of wood shrinkage expansion You maybe required to use the provided spacers and place a space of 2mm to ensure every roof board lines up with the truss Ensure the roof board...

Страница 10: ...x40mm screws Please Note Ensure to screw through each of the floor boards into the floor bearers 528x40mm Screws 40mm screw Pre drill hole Cut to fit Roof Closure Trim Internal 25 Step 15 Parts needed...

Страница 11: ...onal Parts needed No 5 QTY 1 No 6 QTY 1 Measure and mark along the roof following the position of the front two roof purlins to create guide lines Place the dormer side panels No s 5 6 on top of the r...

Страница 12: ...2 3 4 5 6 7 1 2 3 Step 20 Felting the Dormer Parts needed No 27 Cut the felt into three strips following the shape of the dormer roof and lay on the roof in the order shown in the illustration Ensure...

Страница 13: ...nd fix with 3x40mm screws Ensure the angled cuts meet at the top of the apex 18x40mm Screws Pre drill hole 40mm screw Step 22 Parts needed No 26 QTY 10 Arrange the storm braces No 26 around the buildi...

Отзывы: