background image

P 10

17

Please retain product label and instructions for future reference

             

Step 14

Parts needed - No. 17 QTY 66 

Place the first floor board (No. 17)

inside the building flush to the log

board on one side. Continue adding

the floor boards (

internally

) making

sure to interlock each individual

board.

*Do 

NOT

 secure the boards until

the last board has been measured

and cut.

Following the same method outlined

previously, measure the gap between

the bottom of the tongue (on the last 

board placed) and the log board.

Using a straight edge mark out the 

measurement onto the last floor

board (No. 17) and cut along the 

length removing the excess.

**Please note:

 Mark the final board

2mm under the measurement; This

will allow the timber to expand and

contract correctly.

Once all the floor boards are in 

position secure each board into

position using 8x40mm screws.

***Please Note: 

Ensure to screw 

through each of the floor boards 

into the floor bearers.

528x40mm Screws 

40mm 

screw

Pre drill 

hole

*

Cut to fit

Roof

Closure Trim

Internal

25

Step 15

Parts needed - No. 25 QTY 9 

   

 

Inside the building place the closure 

trim (No. 25) against the boarding and 

align with the roof as shown in the 

illustration. 

Once in position fix each trim 

into place by pre drilling a pilot hole 

and using 6x30mm screws per trim, 

equally spacing them along the face of 

the board.

54x30mm Screws

Pre drill 

hole

30mm 

screw

*

trim to fit

*Measure and cut the

closure trims to

fit the internal space.

25

25

Step 16

Parts needed - No. 25 QTY 9 

Once the floor has been laid arrange the

closure trim (No. 25) around the outside edge 

of floor (internally), measure and cut down 

accordingly to best match the internal

space.

Secure each trim section into place

using 6x30mm spaced equally along the

board as shown in the illustration.

*Do NOT fix the closure trim to the floor

boards.

54x30mm Screws

 

30mm 

screw

Pre drill 

hole

*

Cut to fit

Содержание 0644LOG186-V4

Страница 1: ...cur during excessive dry spells due to an interior moisture loss Unfortunately these processes cannot be avoided but can be helped It is suggested that the outdoor building is sprayed with water durin...

Страница 2: ...4x130mm QTY 84 LB44 C 130 Log Board 120x44x5500mm QTY 18 LB44 A 5500 Log Board 120x44x4000mm QTY 10 LB44 A 4000 Log Board 120x44x474mm QTY 28 LB44 B 474 Log Board 120x44x1896mm QTY 28 LB44 B 1896 15 1...

Страница 3: ...ggered pattern Before securing ensure that the boards are fitted properly in their respective tongues and grooves Nail Bag 40mm Screw x882 30mm Screw x108 120mm Screw x16 P 3 Please retain product lab...

Страница 4: ...her at each corner using 8x70mm screws ensuring the frame is flush Ensure the 58mm side of the bearer is laying on the base so that you can screw the bearers together on the 44mm side 8x70mm Screws b...

Страница 5: ...ide of the door and window openings can be placed either side depending on your needs Step 5 See Pre Assembly Parts needed No 9 QTY 12 No 10 QTY 36 No 11 QTY 6 No 13 QTY 12 No 14 QTY 12 Following the...

Страница 6: ...ons for future reference Step 6 See Window Assembly Parts needed No 1 QTY 8 Refer to window assembly instructions to assemble windows Step 7 Parts needed No 1 QTY 8 Ensure that the lip of the window f...

Страница 7: ...embly Parts needed No 9 QTY 14 No 10 QTY 42 No 11 QTY 9 No 13 QTY 14 No 14 QTY 14 No 15 QTY 1 No 16 QTY 2 Following the same method outlined in Pre Assembly lay the remaining boards No s 9 10 11 13 14...

Страница 8: ...per purlin Please note The gable shown is for illustrative purposes and may differ in width from your choice in product Nevertheless despite any differences the process of fixing the roof purlins is...

Страница 9: ...s Due to natural occurences of wood shrinkage expansion You maybe required to use the provided spacers and place a space of 2mm to ensure every roof board lines up with the truss Ensure the roof board...

Страница 10: ...x40mm screws Please Note Ensure to screw through each of the floor boards into the floor bearers 528x40mm Screws 40mm screw Pre drill hole Cut to fit Roof Closure Trim Internal 25 Step 15 Parts needed...

Страница 11: ...onal Parts needed No 5 QTY 1 No 6 QTY 1 Measure and mark along the roof following the position of the front two roof purlins to create guide lines Place the dormer side panels No s 5 6 on top of the r...

Страница 12: ...2 3 4 5 6 7 1 2 3 Step 20 Felting the Dormer Parts needed No 27 Cut the felt into three strips following the shape of the dormer roof and lay on the roof in the order shown in the illustration Ensure...

Страница 13: ...nd fix with 3x40mm screws Ensure the angled cuts meet at the top of the apex 18x40mm Screws Pre drill hole 40mm screw Step 22 Parts needed No 26 QTY 10 Arrange the storm braces No 26 around the buildi...

Отзывы: