It is ESSENTIAL that you apply wood
treatment immediately after the building
has been assembled.
P 13
Please retain product label and instructions for future reference
23
23
23
23
24
24
Step 21
Parts needed - No. 23 QTY 4
No. 24 QTY 2
Align the fascias (No. 23)
with the roof and fix into
place using 3x40mm
screws per fascia, making
sure to screw through the
fascia into the roof purlins
and eaves frame. Then align
the fascias (No. 24) with the
front of the dormer and fix
with 3x40mm screws.
*Ensure the angled cuts
meet at the top of the apex.
18x40mm Screws
Pre drill
hole
40mm
screw
Step 22
Parts needed - No. 26 QTY 10
Arrange the storm braces (No. 26)
around the building (internally).
Place 2x storm braces per side
fixing into place using 2x 90mm
bolts per brace making sure the
washer & nut are tightened from
the outside of the building.
*Ensure the storm braces are
secured at the highest point
possible on each side.
**Storm braces will help your
building expand and contract
properly.
***It is important that each
bolt is tightened using a
washer so as not to damage
the log boards.
20x90mm Bolt Sets
Pre drill
hole
90mm
bolt
26
26