Pre drill
hole
70mm
screw
P 4
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Please retain product label and instructions for future reference
Example picture
2 screws per bearer per end.
7
20
19
20
20
19
19
20
20
20
20
20
20
20
20
20
Step 2
Parts needed - No 19 QTY 2
No. 20 QTY 10
Repeat Steps 5 & 6 to create
the second half of your base.
Once built secure the two
sections together using
70mm screws, ensuring to fix
in an alternating pattern as
shown in the illustration to
avoid screws colliding.
88x70mm Screws
12
12
7
7
a
Pre drill
hole
70mm
screw
Step 1
Parts needed - No. 19 QTY 2
No. 20 QTY 10
Lay the bearers (No. 19 & No.
20) onto a firm and level surface
(free from areas where standing
water can collect) as shown in the
illustration.
Fix the framing together at each
corner using 8x70mm screws,
ensuring the frame is flush.
*Ensure the 58mm side of the bearer
is laying on the base so that you can
screw the bearers together on the
44mm side.
8x70mm Screws
b
Pre drill
hole
70mm
screw
Following the same
method, arrange the
remaining bearer’s (No. 20)
inside the assembled frame.
*Ensure there is an equal
amount of space between each
frame.
Secure each of the frames in
place using 2x70mm screws for
each side of the bearer, ensur-
ing the framing remains level.
32x70mm Screws
Pre drill
hole
70mm
screw
Step 3
(See Pre-Assembly)
Parts needed - No. 7 QTY 2
No. 12 QTY 2
Place the boards (No. 7 & 12)
on to the assembled base
frame along the longest
sides.
*Ensure the notches at
either end of each board are
flush and level with the ends
of the frame.
Fix each of the starter boards
to the frame by screwing
through the notch into the
frame as shown in the
illustration.
4x70mm Screws