P 5
Please retain product label and instructions for future reference
Place the Left Gable
(No.10)
and the
Right Gable
(No.11)
onto the side
panels, ensuring the boards interlock.
Secure in place using 4x50mm screws
per gable top, screwing in an alternating
pattern.
Using 2x50mm screws, fix gables to the
front panels at the corners.
12x50mm Screws
Pre drill
hole
50mm
screw
Step 8
Parts needed - No.10 QTY 1
- No.11 QTY 1
11
10
Step 9
Pre drill
hole
30mm
screw
24
28
28
14
14
Connect the ridge bars
(No.14)
together
with the metal “U”
(No.24)
channel, using
10x30mm screws. Ensure the ridge bar
sits into the U-channel with equal spacing
on each side.
Attach the “L”
(No.28)
brackets to each
end of the Ridge support with 2x30mm
screws per bracket.
*Ensure the bracket are flush with the
ends of the ridge bar.
14x30mm Screws
Parts Needed -
No.14 QTY 2
- No.24 QTY 1
- No.28 QTY 2
IMPORTANT:
Pre-drill before fixing screws.
Step 10
Parts needed - No.14 QTY 2
- No.28 QTY 2
Pre drill
hole
30mm
screw
Align the ridge bar
(No.14)
between the gables and secure to
the central uprights with 2x30mm
screws per bracket
(No.28)
, as
shown in the illustration.
*Ensure the ridge bar is flush with
the top framing of the gable tops.
4x30mm Screws
14
14
28
Step 11
Parts needed - No.7 QTY 3
- No.15 QTY 6
50mm
screw
Pre drill
hole
Fix the Eaves framing
(No.15)
to the roof
(No.7)
using 4x50mm screws per eaves
framing, screwing through the eaves framing
and into the roof framing.
Ensure the eaves framing is flush to the
edges of the roof framing before securing
24x50mm Screws
15
15
7
15
15
7
15
15
7
Содержание 01DTPRMSHPN1406DDOP-V1
Страница 10: ...2 1 3 4...
Страница 11: ...1 2 REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE...