Mercia Garden Products 01DTPRMSHPN1406DDOP-V1 Скачать руководство пользователя страница 6

P 6

Please retain product label and instructions for future reference

             

Using 9x100mm screws, fix the roof 

(No.7)

 onto the ridge bar 

(No.14)

ensuring to go through the roof 

framing and into the ridge bar.

9x100mm Screws

100mm 

screw

Pre drill 

hole

Step 12

Parts needed- No.7 QTY 3

Place the Roofs 

(No.7) 

onto the top 

of the building, ensuring the side 

edges are flush with the building 

and there is equal spacing at the 

front and back.

Fix the Roofs together internally, 

using 4x50mm screws in alternating 

sides as shown in the diagram.

8x50mm Screws 

50mm 

screw

Pre drill 

hole

*internal view*

7

7

7

14

Step 13

7

7

7

Fix the roofs 

(No.7) 

to the top of the 

building, ensuring the side edges are 

flush with the building and there is 

equal spacing at the front and back.

Using 70mm Screws, fix the roof 

(No.7)

 around each edge, ensuring 

the screws go through to the panel 

framing below.

HINT - Follow the nailing line of the 

framing on the roof panels so that 

you are more likely to fix through the 

roof framing into the panel framing 

below. 

32x70mm Screws

70mm 

screw

Pre drill 

hole

Step 14

b b

b

b b

b

b

b

b b

b

b

b

b

50mm 

screw

Pre drill 

hole

Once the roof is fixed, attach the 

building to the floor with 50mm 

screws.

Ensure the screws go through the 

panel into the floor framing

28x50mm Screws

b

b

Step 15

Содержание 01DTPRMSHPN1406DDOP-V1

Страница 1: ...avoid placing your garden building underneath large trees to prevent the tree causing damage to the building TIMBER As with all natural materials timber can be affected during various weather conditio...

Страница 2: ...V1 Framed Window QTY 1 AI FW1000X540 V1 Fascias 12x90x1898mm QTY 2 S1290 1898MM 11 Door Block 27x44x160mm QTY 4 F2744 160MM 12 Ridge Bar 27x70x2012mm QTY 2 F2770 2012MM 13 14 Eaves Framing 28x28x1379...

Страница 3: ...e floors together using 20x50mm screws through the floor bearers in an alternating pattern Once fixed together turn the floor back the right way up 20x50mm Screws Step 1 Parts needed No 1 QTY 3 SECOND...

Страница 4: ...n fitted Position the panels so there is equal spacing between the floor and cladding on all sides 6x50mm Screws front a Pre drill hole 50mm screw Place the Door panel No 3 onto the floor Fix the pane...

Страница 5: ...end of the Ridge support with 2x30mm screws per bracket Ensure the bracket are flush with the ends of the ridge bar 14x30mm Screws Parts Needed No 14 QTY 2 No 24 QTY 1 No 28 QTY 2 IMPORTANT Pre drill...

Страница 6: ...0mm screw Pre drill hole internal view 7 7 7 14 Step 13 7 7 7 Fix the roofs No 7 to the top of the building ensuring the side edges are flush with the building and there is equal spacing at the front...

Страница 7: ...7 Step 17 Parts needed No 12 QTY 1 No 18 QTY 1 No 25 QTY 2 18 12 Opening Window Fixed Window 25 Pre drill hole 16mm screw 30mm screw 30mm Screws 16mm screws Opening Window Place the Window Cover Trim...

Страница 8: ...g and into the block Fix the Door Beading strips No 19 to the door framing and secure using 4x30mm screws per strip 9x30mm Screws 6x40mm Screws Pre drill hole 30mm screw 40mm screw 13 a 26 26 13 b a c...

Страница 9: ...he doors Measure and mark the holes of the lock No 31 and drill through the boards and through the framing and door blocks Fix the lock onto the door using 8x60mm Carriage Bolts and Nuts 8x60mm Carria...

Страница 10: ...2 1 3 4...

Страница 11: ...1 2 REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE...

Отзывы: