Please retain product label and instructions for future reference
Using 9x100mm screws, fix the roof
(No.7)
onto the ridge bar
(No.14)
,
ensuring to go through the roof
framing and into the ridge bar.
9x100mm Screws
100mm
screw
Pre drill
hole
Step 12
Parts needed- No.7 QTY 3
Place the Roofs
(No.7)
onto the top
of the building, ensuring the side
edges are flush with the building
and there is equal spacing at the
front and back.
Fix the Roofs together internally,
using 4x50mm screws in alternating
sides as shown in the diagram.
8x50mm Screws
50mm
screw
Pre drill
hole
*internal view*
7
7
7
14
Step 13
7
7
7
Fix the roofs
(No.7)
to the top of the
building, ensuring the side edges are
flush with the building and there is
equal spacing at the front and back.
Using 70mm Screws, fix the roof
(No.7)
around each edge, ensuring
the screws go through to the panel
framing below.
HINT - Follow the nailing line of the
framing on the roof panels so that
you are more likely to fix through the
roof framing into the panel framing
below.
32x70mm Screws
70mm
screw
Pre drill
hole
Step 14
b b
b
b b
b
b
b
b b
b
b
b
b
50mm
screw
Pre drill
hole
Once the roof is fixed, attach the
building to the floor with 50mm
screws.
Ensure the screws go through the
panel into the floor framing
28x50mm Screws
b
b
Step 15