Step 23

Parts needed- No.22 QTY 4

 

 

-No.23 QTY 2

Fix the Fascias 

(No.22 and No.23)

 

to each side of the building, 

ensuring they are flush to the top 

of the building, secure using 

3x40mm screws per fasica.

18x40mm Screws

23

22

22

22

22

23

Pre drill 

hole

40mm 

screw

60mm 

Bolts

Pre drill 

hole

Step 21

Parts needed- No.31 QTY 1

Align the lock 

(No.31)

 to the door, 

ensuring equal spacing between 

the cover trims and across the 

doors.

Measure and mark the holes of the 

lock 

(No.31)

 and drill through the 

boards and through the framing 

and door blocks

Fix the lock onto the door using 

8x60mm Carriage Bolts and Nuts  

8x60mm Carriage Bolts and Nuts

31

31

Step 22

Parts needed -No.20 QTY 5

 

 

-No.21 QTY 5

21

21

21

21

21

20

20

20

20

20

Fix the Cover trims 

(No.20 & 

No.21)

 to the corners and across 

each join of the building as shown, 

secure to the buiding using 

3x30mm screws per cover trim.

30x30mm Screws

Pre drill 

hole

30mm 

screw

It is ESSENTIAL that you apply wood 

treatment immediately after the building 

has been assembled.

AFTER TREATMENT:

score around protective

 cover on glazing and

 carefuly peel

 covering back

Содержание 01DTPRMSHPN1406DDOP-V1

Страница 1: ...avoid placing your garden building underneath large trees to prevent the tree causing damage to the building TIMBER As with all natural materials timber can be affected during various weather conditio...

Страница 2: ...V1 Framed Window QTY 1 AI FW1000X540 V1 Fascias 12x90x1898mm QTY 2 S1290 1898MM 11 Door Block 27x44x160mm QTY 4 F2744 160MM 12 Ridge Bar 27x70x2012mm QTY 2 F2770 2012MM 13 14 Eaves Framing 28x28x1379...

Страница 3: ...e floors together using 20x50mm screws through the floor bearers in an alternating pattern Once fixed together turn the floor back the right way up 20x50mm Screws Step 1 Parts needed No 1 QTY 3 SECOND...

Страница 4: ...n fitted Position the panels so there is equal spacing between the floor and cladding on all sides 6x50mm Screws front a Pre drill hole 50mm screw Place the Door panel No 3 onto the floor Fix the pane...

Страница 5: ...end of the Ridge support with 2x30mm screws per bracket Ensure the bracket are flush with the ends of the ridge bar 14x30mm Screws Parts Needed No 14 QTY 2 No 24 QTY 1 No 28 QTY 2 IMPORTANT Pre drill...

Страница 6: ...0mm screw Pre drill hole internal view 7 7 7 14 Step 13 7 7 7 Fix the roofs No 7 to the top of the building ensuring the side edges are flush with the building and there is equal spacing at the front...

Страница 7: ...7 Step 17 Parts needed No 12 QTY 1 No 18 QTY 1 No 25 QTY 2 18 12 Opening Window Fixed Window 25 Pre drill hole 16mm screw 30mm screw 30mm Screws 16mm screws Opening Window Place the Window Cover Trim...

Страница 8: ...g and into the block Fix the Door Beading strips No 19 to the door framing and secure using 4x30mm screws per strip 9x30mm Screws 6x40mm Screws Pre drill hole 30mm screw 40mm screw 13 a 26 26 13 b a c...

Страница 9: ...he doors Measure and mark the holes of the lock No 31 and drill through the boards and through the framing and door blocks Fix the lock onto the door using 8x60mm Carriage Bolts and Nuts 8x60mm Carria...

Страница 10: ...2 1 3 4...

Страница 11: ...1 2 REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE...

Отзывы: