P 3
Please retain product label and instructions for future reference
Pre Assembly
Before assembling remove the transportation
blocks from the bottom of each panel.
Take care removing the blocks as to not damage
the panels. Tap with a flat headed screwdriver
and hammer.
Dispose of the blocks once removed.
50mm Screw x 118
40mm Screw x 28
Felt Tacks x 170
20mm Screw x 10
30mm Screw x 114
60mm Bolt x 8
70mm Screw x 32
100mm Screw x 9
16mm Screw x 6
Nail Bag
There may be extra screws present in the nail bag
Pre drill
hole
50mm
screw
1
1
1
Place the floor panels
(No. 1)
upside
down onto a firm and level base.
Ensure the base has suitable
drainage, free from areas where
standing water can collect.
Secure the floors together using
20x50mm screws through the floor
bearers in an alternating pattern.
Once fixed together turn the floor
back the right way up.
20x50mm Screws
Step 1
Parts needed - No.1 QTY 3
SECONDARY PRIMARY
27
*Inside View*
Fix the T Hinges (
No.27
) onto the
doors (
No.4
) and Door Panel (
No.3
)
as shown using 7x30mm screws per
t-hinge
Ensure that the screws go through
the cladding and into the framing
behind.
42x30mm Screws
Step 2
Parts needed- No.3 QTY 1
-No.4 QTY 2
-No.27 QTY 6
3
4
4
27
27
27
27
27
27
Pre drill
hole
30mm
screw
Place the Side panel
(No.5)
and the 1774mm
Back Panel
(No.9)
onto the floor, Fix the
panels at the corner using 3x50mm Screws
Do not secure the building to the floor
until the roof has been fitted.
Position the panels so there is equal
spacing between the floor and cladding
on all sides.
3x50mm Screws
Pre drill
hole
50mm
screw
Step 3
Parts needed - No.5 QTY 1
- No.9 QTY 1
9
5
a
a
a
a
Содержание 01DTPRMSHPN1406DDOP-V1
Страница 10: ...2 1 3 4...
Страница 11: ...1 2 REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE...