background image

P 7

             

Please retain product label and instructions for future reference

             

P 8

             

Step 19

Parts needed - No.13 QTY 4

 

 

- No.19 QTY 2

 

 

- No.26 QTY 2

b

a

c

Fix the Door block 

(No.13)

 onto the inside of 

the top and bottom of the door next to the 

framing within the Door Panel, secure using 

2x40mm screws going through the front of 

the door boards and into the blocks. Secure 

the turn button 

(No.26) 

onto the door block 

(No.13)

 using 1x30mm screw.

Fix the Door blocks 

(No.13)

 along the central 

framing on the inside of each door as shown 

in the diagram, using 2x40mm screws through 

the door cladding and into the block.

Fix the Door Beading strips 

(No.19)

 to the 

door framing and secure using 4x30mm 

screws per strip.

9x30mm Screws

6x40mm Screws

Pre drill 

hole

30mm 

screw

40mm 

screw

13

a

26

26

13

b

a

c

13

13

13

26

26

13

13

19

19

19

Step 18

Parts needed- No.32 QTY 1

Pre drill 

hole

20mm 

screw

32

Fix the casement stay 

(No.32)

 

to the window and then align 

the fixings to the window panel

framing. Ensure the casement

stay fits onto the fixings when

closed before securing in 

place.

6x20mm Screws

Felt 

tacks 

Step 20

Parts needed- No.30 QTY 3

Cut the Felt 

(No.30)

 into 3 sheets at 

4240mm each. 

Lay onto roof as 

shown in diagram ensuring there is 

a 50mm overhang around the 

sides.

Apply the felt tacks with a 100mm 

space per tack.

170xFelt tacks

HANDLE

WITH CARE

2

3

4

30

1

2

3

Содержание 01DTPRMSHPN1406DDOP-V1

Страница 1: ...avoid placing your garden building underneath large trees to prevent the tree causing damage to the building TIMBER As with all natural materials timber can be affected during various weather conditio...

Страница 2: ...V1 Framed Window QTY 1 AI FW1000X540 V1 Fascias 12x90x1898mm QTY 2 S1290 1898MM 11 Door Block 27x44x160mm QTY 4 F2744 160MM 12 Ridge Bar 27x70x2012mm QTY 2 F2770 2012MM 13 14 Eaves Framing 28x28x1379...

Страница 3: ...e floors together using 20x50mm screws through the floor bearers in an alternating pattern Once fixed together turn the floor back the right way up 20x50mm Screws Step 1 Parts needed No 1 QTY 3 SECOND...

Страница 4: ...n fitted Position the panels so there is equal spacing between the floor and cladding on all sides 6x50mm Screws front a Pre drill hole 50mm screw Place the Door panel No 3 onto the floor Fix the pane...

Страница 5: ...end of the Ridge support with 2x30mm screws per bracket Ensure the bracket are flush with the ends of the ridge bar 14x30mm Screws Parts Needed No 14 QTY 2 No 24 QTY 1 No 28 QTY 2 IMPORTANT Pre drill...

Страница 6: ...0mm screw Pre drill hole internal view 7 7 7 14 Step 13 7 7 7 Fix the roofs No 7 to the top of the building ensuring the side edges are flush with the building and there is equal spacing at the front...

Страница 7: ...7 Step 17 Parts needed No 12 QTY 1 No 18 QTY 1 No 25 QTY 2 18 12 Opening Window Fixed Window 25 Pre drill hole 16mm screw 30mm screw 30mm Screws 16mm screws Opening Window Place the Window Cover Trim...

Страница 8: ...g and into the block Fix the Door Beading strips No 19 to the door framing and secure using 4x30mm screws per strip 9x30mm Screws 6x40mm Screws Pre drill hole 30mm screw 40mm screw 13 a 26 26 13 b a c...

Страница 9: ...he doors Measure and mark the holes of the lock No 31 and drill through the boards and through the framing and door blocks Fix the lock onto the door using 8x60mm Carriage Bolts and Nuts 8x60mm Carria...

Страница 10: ...2 1 3 4...

Страница 11: ...1 2 REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE...

Отзывы: