Mennekes Portable Power Distribution Box Скачать руководство пользователя страница 11

11

DE

EN

 

Set toggle (

1

) of the protective elements to the "

I"

 (

ON

position, or to the green display (

2

) (dependent on the 

protective element).

 

Close the inspection window.

5.5  Check power distribution box for 

defects prior to use

The power distribution box should be checked for defects 

before each use. A qualified electrician must eliminate any 

defects before use.

What kind of defects can occur?

 

Defective enclosure (e. g. major deformations, cracks, 

breaks).

 

Defective or missing components (e. g. sockets, hinged 

lids for sockets, inspection window).

 

Defective electrical lines (e. g. kinks, cuts, pinched 

points).

 

Defective or missing protective elements.

What should you pay attention to before use?

 

Check the power distribution box for defective or mis-

sing components and replace these as needed.

 

Replace defective seals (e. g. at sockets, plugs, inspec-

tion window, etc.).

 

Clean soiled components, especially contact parts.

 

If there are scorch marks on contact parts (e. g. welding 

beads), have a qualified electrician replace the affected 

plugs and sockets.

 

Only put fault-free power distribution boxes into service.

5.6  Earthing of power distribution box 

(optional)

The power distribution box must be properly 

earthed before it is put into service and with due 

consideration of the standards DIN VDE 0100-410 

and DIN VDE 0100-540.

Additional earthing via optional ground terminals 

can be required, dependent on the mains type.

Do not connect any electrical consumers to 

the power distribution box, unless it is properly 

earthed.

Connecting the earthing wire

Ground terminal

The power distribution box can be equipped with an opti-

onal ground terminal for the additional connection of an 

earthing wire.

 

Loosen the ground terminal by rotating it to the left-

hand side.

 

Connect the earthing wire.

 

Fasten the earthing wire by rotating the ground terminal 

to the right-hand side.

 

Check the earthing wire for tight fit.

Содержание Portable Power Distribution Box

Страница 1: ...ENGLISH 16A 32A 63A 125A Portable Power Distribution Box Operating Manual...

Страница 2: ...2016 MENNEKES Elektrotechnik GmbH Co KG All rights are reserved by the publisher including the reprinting and the duplication of this manual and its translation in whole or in part No part of this man...

Страница 3: ...nto service 13 6 1 1 Connecting the power distribution box 14 6 1 2 Connecting electrical consumers 14 7 Operation 14 7 1 Opening Closing of inspection window 14 7 2 Connecting Removing electrical con...

Страница 4: ...also include further documentation e g instructions for device components diagrams etc which must also be fully observed 1 1 Contact details MENNEKES Elektrotechnik GmbH Co KG Industrial plugs and soc...

Страница 5: ...persons or animals cannot access the device This also includes children and people with disabi lities who are not able to accurately assess the potential hazards associated with handling the device Y...

Страница 6: ...ice Keep animals away from the device Protective measures must be taken as needed Persons under the influence of drugs alcohol or other intoxicating substances must not use the device This can result...

Страница 7: ...ribution box is used solely for the distribution and control of electrical energy The power distribution box is intended for use in indoor and outdoor locations as a portable power distribution system...

Страница 8: ...with hinged lids 5 Nameplate 6 Sign 7 Inspection window 8 Protective elements 9 Front panel The illustrations in this manual may not exactly correspond in a visual sense to the device due to device v...

Страница 9: ...sport of power distribution box CAUTION There is a risk of injury if the device falls Transport the power distribution box with the aid of a second person if needed or use appropriate means of transpo...

Страница 10: ...o tection classes can result in leakage Only connect plugs and sockets with the same protec tion class ATTENTION The use of plugs and sockets with different protection classes will reduce the effect o...

Страница 11: ...ow etc Clean soiled components especially contact parts If there are scorch marks on contact parts e g welding beads have a qualified electrician replace the affected plugs and sockets Only put fault...

Страница 12: ...electric shock A residual current device FI RCD of type AC A of a given electrical installation can in the event of a fault become inoperative due to an impermissible switching sequence if this device...

Страница 13: ...0 6 Setting up process 6 1 Putting the power distribution box into service Prior to putting the power distribution box into service check whether the connection data of the power distributi on box mat...

Страница 14: ...ctrical consu mers Risk of injury Always use the ON OFF switches of electrical consu mers to switch these off before connecting these to the power distribution box Connecting consumers Chapter 7 2 7 O...

Страница 15: ...Cleaning The power distribution box can be cleaned with a dry or a damp cloth However cleaning with a dry cloth at regular intervals is recommended in order to prevent persistent soiling on the surfa...

Страница 16: ...f the supply line Close all protective devices e g inspection window hinged lids for sockets Only clean the power distribution box from the outside ATTENTION Material damage of the device due to incor...

Страница 17: ...material alterations missing com ponents etc and its proper functioning e g protective elements regularly If defects are detected on the device they must be rectified without delay A damaged faulty de...

Страница 18: ...defects are detected on the device they must be rectified before use by a qualified electrician Checking residual current devices FI RCDs Residual current devices FI RCDs can vary in terms of appeara...

Страница 19: ...llations equipped with AC DC sensitive residual current devices FI RCDs of type B B these could sustain damage due to incorrectly performed tests ATTENTION Material damage of protective element due to...

Страница 20: ...rew the screws 1 on the exterior of the enclosure Removing the device carrier Loosen the strain relief of the screwed cable gland of the supply line at the rear of the device Pull the device carrier 1...

Страница 21: ...er Fit the device carrier 1 into the enclosure All the while carefully pulling out the supply line at the rear of the device Once the device carrier is completely seated in the enclo sure fasten the s...

Страница 22: ...mple residual current or an overloaded electrical circuit Situation A A circuit breaker is triggered Course of action Visually inspect the power distribution box and the con nected electrical consumer...

Страница 23: ...ve a positive impact on the service life of the device Clean the device before placing it into storage Chapter 9 Close hinged lids for sockets the inspection window and any other covers Roll up the su...

Страница 24: ...mbH Co KG Industrial plugs and sockets Aloys Mennekes Str 1 57399 Kirchhundem GERMANY Tel 49 0 2723 41 1 Fax 49 0 2723 41 2 14 E Mail info MENNEKES de Internet www MENNEKES de 1010190DS_BAL_Mobiler Ve...

Отзывы: