12616, Rev. B
10. Replacement of Thread Breakage Sensor, S Board(unit), Upper Shaft Sensor and Solenoid.
25
(b) Replacing Upper thread tension unit (upper
thread tension spring and magnet).
I. Remove 2 bind screws 4x8(E), and
replace upper thread tension unit(F).
Fig.10-5.
II.After replacing, adjust the tension.
Par.12-3.
2. Replacement of S board(unit).
I. Remove 14 bind screws 4x5, and
remove bottom plate.
II.Remove S board connector(G) from A
board. Fig 10-2.
III. Remove set screw
4x6.5(H), and remove
shuttle cover.(I)
Fig.10-6.
FIGURE 10-4
F
FIGURE 10-5
E
D
C
FIGURE 10-6
H
I