Assembly and Installation of –
i
System Test Stands
Mecmesin
5
Inserting the adjustable handle lever
On single-column test stands, slide the loadcell (ILC) sideways onto the dovetail bracket at
the front of the crosshead. The threaded stud must always be on the underside. Secure the
loadcell using the handle lever. Some lateral adjustment is available if needed to align the
ILC and a sample. Slacken the lever to make the adjustment, and then re-tighten.
Note:
There is some additional adjustment available by moving the anvil plate. Use a
3 mm Allen key to slacken the four retaining screws, reposition the anvil plate and re-
tighten the screws.
Align the electrical connector of the ILC with the socket on the test stand. Gently push the
connector to locate, then tighten the knurled locking ring in a clockwise direction.
Slide the loadcell onto the dovetail …
tighten securely …
connect the loadcell
Twin-column stands
The ILC is attached to a twin-column test stand using a cap-head bolt passed through the
central hole in the moving crosshead, and secured using the Allen key provided.
Attaching a loadcell on a twin-column system
Содержание MultiTest 0.5-i
Страница 1: ...Assembly and Installation of MultiTest i and Vortex i System Test Stands 431 393 07 December 2018 ...
Страница 4: ...iv Mecmesin Assembly and Installation of i System Test Stands ...
Страница 23: ...Assembly and Installation of i System Test Stands Mecmesin 19 EC Declaration of Conformance ...