10
Mecmesin
Assembly and Installation of –
i
System Test Stands
4.3
Swapping intelligent torque cells
You can swap the torque cell by simply disconnecting one cell, removing the crosshead
and then fitting another. First, log out of Emperor and then switch off the stand before
unplugging the torque cell. When the new torque cell has been connected, switch the
stand on again, log on, and after a few seconds the new torque cell will be automatically
recognised. Emperor will read in the new cell’s range, serial number and calibration
status.
ITC connector
Содержание MultiTest 0.5-i
Страница 1: ...Assembly and Installation of MultiTest i and Vortex i System Test Stands 431 393 07 December 2018 ...
Страница 4: ...iv Mecmesin Assembly and Installation of i System Test Stands ...
Страница 23: ...Assembly and Installation of i System Test Stands Mecmesin 19 EC Declaration of Conformance ...