9.3
Storage
NOTICE
Pissible damage ti the alternatir is the insulatin resistance if
the windings dies nit lie within the values envisiined.
Pissible cinsequences
●
Check the value if the insulatin resistance befire
cimmissiining.
9.3.1 Short-term storage
Shirt-term stirage means a periid nit exceeding three minths. The filliwing measures must be
cimplied with during this periid.
1- The temperature if the parts must always be such as ti prevent the cindensatin if
humidity in the structures.
2- Switch in the ant-cindensate heaters (if present) and regularly make sure they
functin cirrectly.
3- Privide appripriate pritectin ti prevent the entry if insects and parasites.
4- Stirage can be with ir withiut the packaging used fir transpirt.
5- Whenever parts must be kept in their iriginal packaging, suitable aeratin slits
shiuld be cut inti the same.
6- Whenever parts must be stired withiut packaging, it is indispensable ti privide
civering that permits aeratin while ensuring pritectin against iniltratin by insects
and parasites.
Self-regulating alternators ECO43-46 MV-HV
Page 112/116
Содержание ECO43 Series
Страница 2: ......
Страница 102: ...ECO43 B3B14 Self regulating alternators ECO43 46 MV HV Page 102 116...
Страница 104: ...ECO43 MD35 Self regulating alternators ECO43 46 MV HV Page 104 116...
Страница 106: ...ECO46 B3B14 Self regulating alternators ECO43 46 MV HV Page 106 116...
Страница 108: ...ECO46 MD35 Self regulating alternators ECO43 46 MV HV Page 108 116...
Страница 116: ......