I-4
MX-2100/2104
Installation and Operation Manual
Power-Up with Supervision Terminal Connected,
4-12
PRBS Transmission, 5-14
Priority Bumping, 1-27
PWD, E-8
—R—
Ratings of Ring and Feed Voltage Supplies, 2-7
Rear Panel
MX-2100, 1-7
MX-2104, 1-9
Redundancy, 1-20
KML Module, 1-21
KPS Module, 1-21
Remote
Channel Loop, 5-13
In-Band Management, 1-5
MX-2100 Management, 1-4
Main Link Loop, 5-9
Main Link Modem Loop - Loop 2, 5-11
Out-of-Band Management, 1-5
Request to Send, 2-9
Requirements
Power Supply Modules, 2-3
RI, 2-10
Ring Indication, 2-10
RTS, 2-9
—S—
Setting Internal Jumpers
KPS Module, 2-13
Site Requirements, 2-2
SNMP Environment, C-1
Management Domains Under SNMP, C-3
SNMP Management
IP Environment, C-4
SNMP Environment, C-1
SNMP Principles, C-1
SNMP TRAPS, C-8
SNMP Principles, C-1
SNMP TRAPS, C-8
Software Download
Cold (Local) Installation, D-1
General, D-1
Warm Installation (Upgrading), D-3
SP Parameters Specific Configuration Instructions
Data, 3-12
Management, 3-12
Parity, 3-12
Speed, 3-12
Speed, 3-12, E-7
SPEED, 3-11, E-4
Starting a Session
Multiple MX-2100, 4-14
Single MX-2100, 4-13
Sub Link Timing, 1-48
Supervision and Configuration, 1-4
Supervision Language, 4-1
Command Language Syntax, 4-1
Command Options, 4-2
Command Protocol, 4-3
Commands, F-2
Index of Commands, 4-4
Supervision Terminal Operating Instructions
Control Session, 4-15
Ending a Control Session, 4-15
Power-Up with Supervision Terminal Connected,
4-12
Starting a Session - Multiple MX-2100, 4-14
Starting a Session - Single MX-2100, 4-13
Supervisory Port Configuration Parameters
AUXILIARY_DEVICE, E-8
CTS, E-7
DATA, E-7
DCD_DEL, E-7
DSR, E-7
INTERFACE, E-7
LOG_OFF, E-8
PARITY, E-7
POP_ALARM, E-8
PWD, E-8
SPEED, E-7
Supervisory Port Connector, 1-38
Supervisory Port Interface Characteristics, 2-8
Switch Mode, 1-30
Switched Backup Operation, 1-28
Using Dial-up Modems, 1-28
Using ISDN Lines, 1-29
SYNC, E-5
System Configuration Parameters
DWLD_BW_B, E-2
System Configuration Parameters
CLK_FBACK, E-2
CLK_MASTER, E-1
DWLD_BW_A, E-2
ML_MODE, E-2
System Installation
Grounding, 2-2
Site Requirements, 2-2
System Management, 1-32
System Parameters - Specific Configuration
Instructions, 3-9, E-1
ACTIVE_ML, 3-10
CLK_FBACK, 3-9
CLK_MASTER, 3-9
DWLD_BW_A, DWLD_BW_B, 3-9
ML_MODE, 3-10
System Supervision and Configuration, 1-4
System Timing Considerations, 1-39
DCE Timing, 1-42
DTE Timing, 1-40
External DCE Timing, 1-41
Internal Timing, 1-43, 1-44
Loopback Timing, 1-43
Main Link Timing, 1-45