Reworking the example by using the lower temperature as 0°C and the higher
temperature as 80°C, we will get:
[ ]
(0.001028/0.001) - 1] - (3*11.7*10
-6
)(80-0)
1 - (80/300)
V
t
= 125
= 4.29 litres
(5.1 litres with 20% safety factor)
Thus, a 6 litres tank is needed.
Therefore, the higher the water temperature, the larger the volume of the tank that
is required.
Note:
If the tank is located at a location with lower pressure, it can be seen that the
volume required will be smaller. Therefore, the expansion tank should be located
at the position with the a low pressure, e.g. on the water return suction line or at the
highest point of a vertical pipe system.
To calculate the expansion tank size for cooling only systems, use the lower temperature as
the design chilled water temperature and the higher temperature as the ambient
temperature (e.g. 35°C).
Generally, the size of the expansion tank for chilled water system is much smaller compared
with the hot water applications.
Using a larger expansion tank than the calculate requirement is OK. The larger volume
will not affect the system, rather it will help to cater for a larger water volume than the value
used in the calculation.
An expansion tank is not required for an open piping system as the reservoir tank itself
will allow for the expansion.
There should only be ONE expansion tank in the close piping system.
Section 6
Page 92
Содержание AC 40A
Страница 1: ...AM MAC ...
Страница 153: ...Appendix 1 ...
Страница 154: ...Appendix 2 Appendix 2 ...
Страница 157: ...GRAPH OF PRESSURE DROP VS FLOW FOR VARIOUS C V RATINGS Appendix 5 1 ...
Страница 158: ......
Страница 159: ...Water Capacity Graph Appendix 5 2 ...
Страница 160: ...CHART 3 FRICTION LOSS FOR CLOSED PIPING SYSTEMS Appendix 6 1 ...
Страница 161: ...CHART 4 FRICTION LOSS FOR OPEN PIPING SYSTEMS Appendix 6 2 ...
Страница 162: ...CHART 5 FRICTION LOSS FOR CLOSED AND OPEN PIPING SYSTEMS Appendix 6 3 ...
Страница 168: ...Appendix 8 Appendix 8 ...
Страница 169: ...Appendix 8 1 ...
Страница 170: ...Appendix 8 2 ...
Страница 171: ...Appendix 8 3 ...
Страница 172: ...Appendix 8 4 ...
Страница 173: ...Appendix 8 5 Appendix 8 5 ...
Страница 174: ...Appendix 8 6 Appendix 8 6 ...
Страница 175: ...Appendix 8 7 Appendix 8 7 ...
Страница 176: ...Appendix 9 ...
Страница 178: ...Appendix 11 1 Appendix 11 1 ...
Страница 179: ...Appendix 11 2 Appendix 11 2 ...
Страница 180: ...Appendix 13 ...
Страница 181: ...Appendix 13 1 ...
Страница 182: ...Appendix 14 Appendix 14 ...
Страница 183: ...Appendix 15 1 Appendix 15 1 ...
Страница 186: ...Appendix 17 Appendix 17 ...
Страница 187: ...Appendix 18 ...
Страница 188: ...CE20DW CE25DW Note PRESSURE DROP CORRECTION FACTOR 1 2947 0 0021 EWTºF Appendix 19 ...
Страница 189: ... 2003 McQuay International 603 55194922 www mcquayup com ISO 9002 REGISTERED ...