56
© 2010 McNeilus Truck and Manufacturing, Inc.
Zero Radius Side Loader
Operation
3.4
Preparation Before Starting Route
1.
If necessary, turn work lights on to enhance vision.
2.
Activate all E-STOP buttons.
3.
Press PUMP switch to activate the hydraulics.
4.
Lower the grabber assembly from the STOWED position
in the hopper.
5.
Figure 31, Item 1).
6.
Open the top door.
7. Disconnect the arm transit latch from the arm, and stow
the chain by hooking the clip to the larger hole on the
boom retainer plate (
attempts to extend the arm with the chain still latched, the
chain will break and it will need replacing.
1
Figure 31
Figure 32
1
Содержание Zero Radius ZR 12 ft. Extended Reach
Страница 50: ...38 2010 McNeilus Truck and Manufacturing Inc Zero Radius Side Loader Operation 6 1 3 2 4 8 7 5 Figure 14...
Страница 80: ...68 2010 McNeilus Truck and Manufacturing Inc Zero Radius Side Loader Operation NOTES...
Страница 101: ...89 2010 McNeilus Truck and Manufacturing Inc Zero Radius Side Loader Preventive Maintenance G H K L J J H K L J G J M M...
Страница 108: ...96 2010 McNeilus Truck and Manufacturing Inc Zero Radius Side Loader Preventive Maintenance M N P R S M R P N S...
Страница 116: ...This Page Intentionally Left Blank...
Страница 117: ...This Page Intentionally Left Blank...
Страница 118: ...888 686 7278 www StreetSmartParts com...