Hydr
aulic
7 - 6
Hydraulic
EP800AD (Acrobat™ HPU)
3)
Install the 4 Hydraulic Pump mounting bolts using a 8mm socket.
Torque the mounting bolts to 10-11 ft-lb (13.5-15 Nm)
4)
Install a new Pick-up O-ring on the Pump. Install the Fluid Pick-
up into the pump oriented down, tighten the bolt on the clip to
secure the Pick-up in place.
5)
Install the Reservoir over the Pump and tubes. Install the 4
Reservoir Bolts through the Reservoir and into the Adapter Plate.
Torque the Reservoir Bolts to 20-25 in-lb (2.3-2.8 Nm)
Pick-up O-ring
Fluid Pick-up
Reservoir Bolts
Adapter Plate
Reservoir
Содержание Acrobat EP800AD
Страница 2: ......
Страница 13: ...Machine Specifications 2 3 Machine Specifications EP800AD Acrobat HPU This page was intentionally left blank...
Страница 40: ...Electrical 6 11 Electrical EP800AD Acrobat HPU This page was intentionally left blank...
Страница 64: ...Previous Revisions 8 7 Previous Revisions EP800AD Acrobat HPU Hydraulic Schematic Revision 1 and 2...
Страница 71: ...Notes 10 1 Notes EP800AD Acrobat HPU NOTES Notes...
Страница 72: ......