43
8. Next, scroll down and select EQUIP TEST.
9. Select SYSTEM TEST.
10. Select ON to run the SYSTEM TEST.
Press DONE to initiate test.
11. Allow the system test to run for its duration
(5-15 minutes). EQUIP TEST SCREEN will
show the system test is ON once selected.
System test will operate the outdoor unit and the
indoor unit through a series of startup tests.
Please proceed to the next step and allow for
startup tests to complete. Do not interrupt power
to outdoor unit, indoor unit, or thermostat
during system test.
Содержание Amana VZC20
Страница 6: ...6...
Страница 48: ...48 4 Select YES to continue 5 Select HEAT PUMP 6 Select SYS SETUP...
Страница 55: ...55 NOTE BOOST MODE is applicable only for AVZC200 AB and GVZC20 AA or later revision...
Страница 56: ...56 https partnerlinkmarketing goodmanmfg com goodman info finder plus...
Страница 57: ...57 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 58: ...58 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 59: ...59 THIS PAGE IS INTENTIONALLY LEFT BLANK...