maxitrak 5 Inch Gauge Alice Скачать руководство пользователя страница 12

[email protected]

                                                                     Copyright maxitrak 2010 

 
 
Do not unscrew so far that the top blows out! Set the SAFETY VALVES to start blowing a 
little below the working pressure (AS SHOWN ON THE BOILER TEST CERTIFICATE) 
 
 
Steam should be raised within 10-15 minutes, pump in extra water with the HANDPUMP 
as necessary. 
 

 

 
DRIVING  

 
 

 
Select  full  forward  gear,  reversing  lever  right  forward.  Open  the  REGULATOR  a  small 
amount and push the loco forward slowly. Continue to push the loco to and fro until steam 
rather than water is expelled from the automatic draincocks and the chimney. Check the 
fire, rake out any charcoal and ensuring you have a good coal fire before taking a heavy 
load.  Couple  the  loco  to  the  train,  select  full  forward  (or  reverse)  gear,  turn  off  the 
BLOWER  and  open  the  REGULATOR  sufficient  to  start  the  train  without  slipping  the 
wheels. Once underway control the speed with the regulator. If the valves are well timed 
and the load is light the engine can be run in the “notch up” position to save steam, pull 
the reversing lever back to its second notch when in forward gear. 
 
 
 
THE MOST IMPORTANT FACET WHEN DRIVING IS TO KEEP SUFFICIENT WATER 
IN THE BOILER, DAMAGE MAY WELL OCCUR SHOULD THE BOILER RUN DRY. 
 
 
Open the WATER VALVE a couple of turns to clear any trapped air, close the valve and 
you should hear the PUMP and NON RETURN VALVES ‘clack’ as water is pumped into 
the  boiler.  Open  the WATER VALVE to control the  flow  of water  setting it  to maintain  a 
steady  water  level  in  the  water  gauge  (about  half  full).  Check  the  pump  ram,  only  the 
merest drop of water should get passed at each stroke of the pump, replace the pump 0 
ring in the event of excessive leakage. 
 
 
The CROSSHEAD PUMP or AXLE PUMP only works when the loco is in motion, use the 
hand pump to top up water when the train is stationary. The water in the tank will be used 
rapidly, lift the lid on the tank and check the level, refill as required. 
 
 
 
 

Содержание 5 Inch Gauge Alice

Страница 1: ...info maxitrak co uk Copyright maxitrak 2010...

Страница 2: ...n do this any number of times until the pipe is correct Be careful on tight bends squeeze the pipe across its width in a vice if it begins to flatten 1 The chassis comes complete and may be run on air...

Страница 3: ...rilled in to the front of the boiler bolts are M3 by 25 brass drill the hole 3 5mm dia NB It is most important that these bolts go into the front lip of the boiler not into the pressure vessel Just ma...

Страница 4: ...r moves in to full forward and back position 7 The main steam pipe in the smoke box can now be fitted This needs to be shaped to fit between the front of the boiler and the threaded hole in the top of...

Страница 5: ...and the motion bracket M3 round head in the front buffer beam Check the holes line up for the hand pump bracket drill or file out the footplate to fit check this with the hand pump its self as well Be...

Страница 6: ...ft of the regulator The longer hand pump pipe is bent in a tight curve to lay along side the pump base and then turns up to match the feed from the tank Pipes B and C 13 The blower pipe D can be bent...

Страница 7: ...n on the top of the boiler and fit the tank over it Position the pipe work under the tank outlets and connect up 15 Take the two bunker sides and fit them to the footplate 5 M2 screws each side The ba...

Страница 8: ...needs to go right in the bottom of the grate is level with the bottom of the firebox Next fit the front ash pan support to the brake cross member This support is a circular brass piece it comes into...

Страница 9: ...an check for leaks the odd weep on a fitting may be expected and you can set the safety valve to go at 80 PSI Once complete you can test run the engine on air or steam Finishing touches you can buy fr...

Страница 10: ...nd has very hot surfaces avoid scalds or burns from any part of the boiler smokebox or pipework Make sure the boiler has a hydraulic test regularly 2 year for steel boiler 4 years for copper boilers C...

Страница 11: ...n the ELECTRIC BLOWER as quickly as possible after the fire is lit Add a thin layer of COAL or ANTHRACITE once the charcoal is well alight The fire should always look bright add more soaked charcoal i...

Страница 12: ...ntrol the speed with the regulator If the valves are well timed and the load is light the engine can be run in the notch up position to save steam pull the reversing lever back to its second notch whe...

Страница 13: ...pen the BLOWDOWN VALVE and drain off the BOILER Drain off the TANKS or TENDER and clear away any dirt or coal dust Clean the SMOKEBOX and TUBES with a flue brush Clean the accumulated soot and oil fro...

Страница 14: ...and adjust 3 2 Return crank has moved Tighten grub screw 3 3 Tightness or binding in cylinders See Problems 1 2 4 Leak in fittings or pipework 4 1 Unions loose Tighten 4 2 Fittings loose Tighten with...

Страница 15: ...s a pinhole through the body If not soak in vinegar and blow through to clear DO NOT attempt to clear a blocked injector with a wire or pin Return to makers for testing 10 3 Water injector too hot Re...

Страница 16: ...egar for 24 hours Remove blowdown valve and washout boiler scale A kettle de furrer can be used but follow manufacturer s instructions 14 Poor steaming and blowdown valve blocked 14 1 Build up of scal...

Страница 17: ...info maxitrak co uk Copyright maxitrak 2010...

Страница 18: ...info maxitrak co uk Copyright maxitrak 2010...

Отзывы: