Master Power GreenE 3.68K Скачать руководство пользователя страница 39

76

7.2 Create a Plant

Click "Add Now " to create your plant.  

Please fill in plant basic info and other info here.

7.3 Add a Logger

Method 1:

 Enter logger SN manually. 

Method 2:

 Click the icon in the right and scan to enter logger SN You can find logger SN in the external 

packaging or on the logger body.

User Manual

77

7.4 Network Configuration

After  the  logger  is  added,  please  configure  the  network  to  ensure  normal  operation.  Go  to  "Plant 
Details"-"Device List", find the target SN and click "Networking".

Step 1

 

- Confirm Wi-Fi Info

Please make sure your phone has connected to the right WIFI network. And click "Start".

Notice

5G WIFI is not supported.
Special characters (e.g. , ; ‘’ = ” ” `) in router name and password are not supported.

 

User Manual

Содержание GreenE 3.68K

Страница 1: ...INSTALLATION OPERATION MAINTENANCE MANUAL GreenE 3 68K 5K ENERGY STORAGE SYSTEM Master Battery S L Paseo de Extremadura 39 28935 M stoles Madrid Spain Tel 34 918 021 649 Fax 34 917 750 542 info maste...

Страница 2: ...ocedure 4 EMS Introduction and Set Up 4 1 Function Description 4 2 Display and Setting 4 3 Setting 4 4 Inquiry 4 5 Statistics 4 6 Restart 5 Battery Storage and Recharging 5 1 Battery storage requireme...

Страница 3: ...on AC coupled systems mostly retro t and Hybrid coupled systems mostly retro t and PV capacity increase as the following schemes show GreenE 3 68K 5 GreenE 3 68K 10 GreenE 5K 10 GreenE 5K 20 Solution...

Страница 4: ...ed with the power generated by the PV system or from the grid 1 2 Operation Modes There are three basic modes that end users can choose via inverter screen APP SELF CONSUME The energy generated by the...

Страница 5: ...formation for the system to operate safely and it is strictly prohibited to torn or damage them Ensure that the warning signs are always well functioned and correct placed The signs must be replaced i...

Страница 6: ...d electric shock When exposed to sunlight the PV array generates dangerous DC voltage which will be present in the DC conductors and the live components of the inverter Touching the DC conductors or t...

Страница 7: ...ut delay CAUTION Risk of injury through lifting or dropping the system The inverter and battery are heavy There is risk of injury if the inverter or battery is lifted incorrectly or dropped during tra...

Страница 8: ...14 Accessory Cable MF GREENE BAT 2 Accessory Cable MF GREENE BAT 3 User Manual 15 Accessory Cable MF GREENE BAT 4 Accessory Cable MF GREENE BAT 5 User Manual...

Страница 9: ...support User Manual 17 1 7 System Appearance Figure 4 GreenE 5K 3 68K Delivery Scope 1 2 3 4 5 Object Description Hybrid Inverter EMS Display Screen Cable Box connected to Inverter MF GREENE BAT Batt...

Страница 10: ...iew 1 2 3 Object Description Battery circuit breaker Output terminal block BACK UP DC isolation switch User Manual 19 Figure 7 Cable Box Part without Covers 1 2 3 4 5 6 7 8 9 Object Description PV1 PV...

Страница 11: ...system panels must not be blocked User Manual 21 The following locations are not allowed for installation Habitable rooms Ceiling cavities or wall cavities On roofs that are not speci cally considere...

Страница 12: ...the system is less than 500mm the ceiling or structural surface above the system must be made of noncombustible material within a radius of 600mm around the system The GreenE 5K 3 68K must be mounted...

Страница 13: ...l N line of converter is connected to grid neutral via internal relays when in stand alone mode Step 4 Remove the debris baf e and secure the battery to the wall with screws and gaskets 24 Figure 11 B...

Страница 14: ...oss section Stripping length of the insulated conductors Stripping length of the outer sheath of the AC cable 12mm to 18mm 4mm2 to 10mm2 approx 13mm approx 53mm Value A B C D The PE conductor must be...

Страница 15: ...f the inverter tighten the nut Figure 16 User Manual 29 8 Connect the AC wiring terminal to the corresponding hole site of the inverter and lock it with a screw driver or electric screw driver suggest...

Страница 16: ...each other via the respective connectors on the left side After you have connected all the modules together close all covers if you want to connect further battery modules you must mount them before...

Страница 17: ...es to the system please only install the additional batteries 3 5 on the side of the system You can connect up to 5 batteries 2 each mounted on top of each other to the GreenE 5K 3 68K To do this carr...

Страница 18: ...ass but inverter still can t achieve export power power is not controllable or always 0 power output Please check installation location of the CT 34 1 2 3 4 Pin Description CT positive electrode White...

Страница 19: ...coupled system Figure 27 AC coupled system User Manual 37 3 System Operation 3 1 Switch On When turning on the system it is very important to follow the steps below to prevent damage to the system WAR...

Страница 20: ...to nd out the reason 3 Please record every detail related to the fault so Company can analyse and solve the fault Any operation of equipment during a fault is strictly forbidden please contact Company...

Страница 21: ...Failure Normal Alarm Protection Dormancy Normal Alarm Normal Alarm Overcharge protection Temperature overcurrent failure protection Normal Alarm Under voltage protection Temperature overcurrent short...

Страница 22: ...ge Battery Capacity User Manual 43 4 2 5 Battery Parameter 4 2 6 BMS parameters 4 2 7 Grid connected output 4 2 8 Inverter output Interface BATTERY PARAMETER TYPE LEAD ACID TEMP 0 0 C SOC 60 Battery t...

Страница 23: ...INV STANDBY DCDC STANDBY UNIT SEC User Manual 45 4 2 14 Error information 4 2 15 System setting 4 2 16 User setting Enter the password before setting up the user ERROR NO WARNING W11 1 FAULT F10 1 Al...

Страница 24: ...e from 1 to 16 Interface Explanation SYS SETTING 1 WORK MODE 2 PV INPUT 3 ZERO EXPORT 4 DRM ENABLE 5 EPS ENABLE 6 REMOTE CTRL 7 START DELAY 8 CEI SPI CTRL 9 GFCICHK ENB 10 DISC MODE 11 DISCHGDEPTH 12...

Страница 25: ...CTRL 1 DISABLE 2 ENABLE User Manual 49 The input value ranges from 20 to 300 which varies with different standards Interface Description START UP DELAY INPUT 30 UNIT SEC CEI SPI CTRL 1 Disable 2 Enabl...

Страница 26: ...POSITIVE to 2 NEGATIVE or 2 NEGATIVE to 1 POSITIVE which is equivalent to changing the direction of the CT wiring For example when the battery is being charged and the grid power is positive it means...

Страница 27: ...attery parameters interface Press ESC to move cursor forward and return to battery parameters interface The value ranges between 10 and 100 Interface Description DISC DEPTH INPUT 60 UNIT User Manual 5...

Страница 28: ...e 9 1 Press ENTER button to con rm the selection and enter restart interface Press ESC button to cancel the selection and return to setting interface Interface Description GRID STD 1 CHN 2 GER 3 AUS 4...

Страница 29: ...m volt of the grid Interface Description VOLT MAX 1 INV MAX 2 GRID MAX User Manual 57 High INV voltage GRID VOLT MAX Volt Min Low INV voltage INV Over Voltage Protection Point Press UP DOWN to adjust...

Страница 30: ...o adjust the minimum frequency of the grid Interface Description FREQ MIN 1 INV MIN 2 GRID MIN User Manual 59 Low INV frequency GRID Freq Min OVER VOLT OVER VOLT ENABLE OVER VOLT START INV Low Frequen...

Страница 31: ...quency over The default option is enable Interface Description OVER FREQ 1 DISABLE 2 ENABLE User Manual 61 OVER FREQ START UNDER FREQ UNDER FREQ ENABLE UNDER FREQ START REACT RESP Press UP DOWN to adj...

Страница 32: ...t 4 3 9 Date time 4 3 10 Clear history 4 3 11 Password Setting Press UP DOWN button to adjust the input gure Press ENTER button to con rm or ESC button to cancel the input and return to setup interfac...

Страница 33: ...nual 65 Threshold setting value The value set by upper computer software Threshold setting trip time The trip time set by upper computer software Threshold auto test value The value of threshold durin...

Страница 34: ...MIN S1 Set 49 8Hz 100ms Tes 49 8Hz 97ms Cur 49 9Hz Pass FACMIN S2 Set 47 5Hz 100ms Tes 47 5Hz 94ms Cur 49 9Hz Pass User Manual 67 4 4 Inquiry Machine model Serial number Firmware Version Running recor...

Страница 35: ...ation refer to 1 to 7 Interface Explanation STAT 1 TIME STAT 2 CONNE TIMES 3 PEAK POWER 4 E TODAY 5 E MONTH 6 E TEAR 7 E TOTAL Operation length of inverter hours Grid connection length hours Press ESC...

Страница 36: ...to use it in time The stored batteries should be disposed according to the following requirements Table 5 2 Stored lithium battery recharging interval 1 If a battery is deformed broken or leaking dis...

Страница 37: ...OLARMAN Smart in Apple Store Android Search SOLARMAN Smart in Google Play User Manual 6 2 Stick Logger Installation Step 1 Assemble logger to the inverter communication interface as shown in the diagr...

Страница 38: ...erver cannot be connected Connection between logger and router normal connection between logger and remote server abnormal Slow ash ON Slow ash 1 Check if the router has access to the network 2 Check...

Страница 39: ...xternal packaging or on the logger body User Manual 77 7 4 Network Con guration After the logger is added please con gure the network to ensure normal operation Go to Plant Details Device List nd the...

Страница 40: ...router does not implement the white black list 4 Remove the special characters in Wi Fi network 5 Shorten the distance between the phone and device 6 Try to connect to other Wi Fi User Manual 79 8 Al...

Страница 41: ...d and plug in to restart machines then check whether the load is short circuited if the fault has been eliminated 2 Contact customer service if fault remains unremoved 1 Cut off all the power Restart...

Страница 42: ...hen wait 2 minutes for the inverter to function normally but if no recovery or fault repeats please contact the local inverter customer service 3 Contact the local power company if voltage and frequen...

Страница 43: ...165 520Vd c 4800W 50Ad c 80Ad c 3000W 4000W 16Aa c 16Aa c 3680W 100Ad c 100Ad c 4600W 5000W MODEL PV Terminal Vmax PV Rated Voltage MPPT Voltage Range MPPT Range full load MPPT Tracker Strings Max Con...

Страница 44: ...e Class Overvoltage Category Ingress Protection Altitude Dimension WxHxD mm Weight Kg Relative Humidity Topology Cooling Display Communication Interface Max Conversion Ef ciency From Battery Max Conve...

Страница 45: ...0 ohms User Manual 89 11 2 Notes After the equipment is out of operation please pay attention to following notes while maintaining Related safety standards and speci cations should be followed in oper...

Страница 46: ...t or damage is caused by installation repairs modi cation or disassembly performed by a service provider or personnel not from company or his authorized partner The fault or damage is caused by the us...

Отзывы: