38
19
Load supply
source (PV is
available)
SUB(default)
Solar-grid-battery:
PV power will provide power
to the load first. If it’s not
sufficient, grid will provide
power to the load. If grid is
not available at the same
time, battery power will back
up.
SBU
Solar-Battery-Grid:
PV power will provide power
to the load first. If it’s not
sufficient, battery power will
provide power to the load.
When battery power is
running out or not available,
grid will back up the load.
20
Load supply
source (PV is
unavailable)
UB(default)
Grid-Battery:
Grid will provide power to
the load at first. If grid is not
available, battery power will
provide power backup.
BU
Battery-Grid:
Battery power will provide
power to the load at first. If
battery power is running out,
grid will back up the load.
This setting is ineffective
during of AC charging.
21
Start charging
time for first
duration of AC
charge
00:00 (Default)
The setting range of start
charging time for AC charger
is from 00:00 to 23:00.
Increment of each click is 1
hour.
22
Stop charging
time for first
duration of AC
charge
00:00 (Default)
The setting range of stop
charging time for AC charger
is from 00:00 to 23:00.
Increment of each click is 1
hour.
23
Start charging
time for
second
duration of AC
charge
00:00 (Default)
The setting range of start
charging time for AC charger
is from 00:00 to 23:00.
Increment of each click is 1
hour.