Before inverter operation, it’s required to set up “Operation Mode” via software. Please
strictly follow below steps to set up. For more details, please check software manual.
Step 1: After turning on the inverter and installing the software, please click “Open
Monitor” to enter main screen of this software.
Step 2: Log in into software first by entering default password “administrator”.
Step 3: Select Device Control>>MyPower Management. It is to set up inverter
operation mode and personalized interface. Refer to diagram below.
Mode
There are three operation modes: Grid-tie with backup, Grid-Tie and Off-Grid.
Grid-tie with backup: PV power can feed-in back to grid, provide power to the
load and charge battery. There are four options available in this mode: Grid-
tie with backup I, II, III and IV. In this mode, users can configure
PV power
supply priority, charging source priority and load supply source priority.
However, when Grid-tie with backup IV option is selected in PV energy supply
priority, the inverter is only operated between two working logics based on
defined peak time and off-peak time of electricity. Only peak time and off-peak
time of electricity are able to set up for optimized electricity usage.