13
H
H (mm)
40 Right - 45 Left
37
Z2 BAM
Z2 ATOM BOMB
37
Z2 Alloy
Right
9
10
Right
5
6
8
11
5
Nm
12
FIG. 23
FIG. 22
FIG. 24
FIG. 25
HOW TO FILL WITH OIL
FIG. 22
Pour the oil little by little when the stanchion tube is fully down and then
pump with the cartridge (11) rod so as to have a better filling. Cartridge
is full when no air is detected when pumping, in the completely closed
position. Check that oil level is at the recommended distance (H) from
the top of the stanchion tube.
SPRING AND CAP
FIG. 23
Fit the spring (9) into the stanchion tube.
Move the preload adjuster (7), in the cap, to the minimum preload
position.
Lubricate the O-ring (10) on the top of the preload knob support (right
slider only) and the O-ring (6) on the cap (5).
FIG. 24 (right leg only)
Screw the cap (5) complete with preload adjuster (7) and lower washer
(8) onto the cartridge (11) rod. Screw cap all the way in.
FIG. 25
Take the stanchion tube and fit the cap (5) by hand. Place the stanchion
tube in a vice making sure it is not damaged or dented in the process.
Tighten the cap at 12 Nm.